Showing 41-60 of 74 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityTechnical CapacityBalancing Zone 1Affected Asset Name
 
 
 
×
×
 
×
 
 
230000000000000000000000023_001astora GmbH and Co. KGInactiveInjection unavailability2021-10-19 16:00:002021-10-26 16:00:00Planned2021-05-28 08:11:06KWh/h2066166.000002066166.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
240000000000000000000000022_002astora GmbH and Co. KGInactiveInjection unavailability2021-10-26 16:00:002021-11-17 22:00:00Planned2021-05-28 08:18:49KWh/h1033083.000003099249.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
250000000000000000000000025_001astora GmbH and Co. KGDismissedOffshore pipeline unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-05-29 06:17:08KWh/h4132332.000000.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
260000000000000000000000025_002astora GmbH and Co. KGInactiveInjection unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-05-30 15:14:10KWh/h4132332.000000.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
300000000000000000000000030_001astora GmbH and Co. KGInactiveInjection unavailability2021-06-07 07:00:002021-06-09 16:00:00Planned2021-06-04 12:48:20kWh/h4132332.000000.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
270000000000000000000000027_001astora GmbH and Co. KGDismissedWithdrawal unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-05-30 15:20:09KWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
280000000000000000000000027_002astora GmbH and Co. KGDismissedWithdrawal unavailability2021-10-04 07:00:002021-10-19 16:05:00Planned2021-06-01 06:06:56KWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
290000000000000000000000027_003astora GmbH and Co. KGInactiveWithdrawal unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-06-04 12:43:09kWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
310000000000000000000000031_001astora GmbH and Co. KGInactiveWithdrawal unavailability2021-06-07 07:00:002021-06-09 16:00:00Planned2021-06-07 22:59:18kWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
410000000000000000000000041_001MET Speicher GmbHInactiveWithdrawal unavailability2022-03-23 06:00:002022-03-24 18:00:00Planned2022-03-17 08:23:25kWh/h2063000.000000.000002063000.0000037Y005053MH0000RUGS Reckrod
420000000000000000000000042_001MET Speicher GmbHInactiveInjection unavailability2022-03-23 06:00:002022-03-24 18:00:00Planned2022-03-17 08:23:50kWh/h957000.00000170000.000001127000.0000037Y005053MH0000RUGS Reckrod
430000000000000000000000043_001MET Speicher GmbHInactiveInjection unavailability2022-07-11 06:00:002022-07-15 16:00:00Planned2022-04-25 15:18:56kWh/h1031000.000000.000001031000.0000037Y005053MH0000RUGS Reckrod
440000000000000000000000044_001MET Speicher GmbHInactiveInjection unavailability2022-07-18 06:00:002022-07-22 16:00:00Planned2022-04-25 15:19:50kWh/h515500.00000515500.000001031000.0000037Y005053MH0000RUGS Reckrod
450000000000000000000000045_001MET Speicher GmbHInactiveWithdrawal unavailability2022-07-18 06:00:002022-07-22 16:00:00Planned2022-04-25 15:20:44kWh/h1031500.000001031500.000002063000.0000037Y005053MH0000RUGS Reckrod
460000000000000000000000046_001MET Speicher GmbHInactiveInjection unavailability2022-07-25 06:00:002022-07-29 16:00:00Planned2022-04-25 15:21:37kWh/h515500.00000515500.000001031000.0000037Y005053MH0000RUGS Reckrod
470000000000000000000000047_001MET Speicher GmbHInactiveWithdrawal unavailability2022-07-25 06:00:002022-07-29 16:00:00Planned2022-04-25 15:22:28kWh/h1031500.000001031500.000002063000.0000037Y005053MH0000RUGS Reckrod
480000000000000000000000048_001MET Speicher GmbHDismissedStorage unavailability2022-10-17 06:00:002022-11-11 16:00:00Planned2022-04-25 15:23:18GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
510000000000000000000000051_001MET Speicher GmbHDismissedInjection unavailability2022-05-13 08:00:002022-05-13 16:00:00Planned2022-05-12 13:04:05kWh/h979000.000000.00000979000.0000037Y005053MH0000RUGS Reckrod
520000000000000000000000051_002MET Speicher GmbHDismissedInjection unavailability2022-05-13 08:00:002022-05-13 16:00:00Planned2022-05-12 13:07:50kWh/h979000.000000.00000979000.0000037Y005053MH0000RUGS Reckrod
530000000000000000000000051_003MET Speicher GmbHDismissedInjection unavailability2022-05-13 00:00:002022-05-14 00:00:00Planned2022-05-12 13:09:45kWh/h529000.00000450000.00000979000.0000037Y005053MH0000RUGS Reckrod
Showing 1-20 of 143 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityInstalled CapacityFuel TypeBidding ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
780000000000000000000000078_001Electrica Energie Verde 1 SRLDismissedProduction unavailability2022-04-27 08:00:002022-04-27 09:00:00Planned2021-07-13 09:38:38MW1.200005.600007.50000Solar10YRO-TEL------PCEF Stanesti
790000000000000000000000079_001Electrica Energie Verde 1 SRLDismissedProduction unavailability2022-04-28 08:00:002022-04-28 09:00:00Planned2021-07-13 09:42:02MW1.200005.600007.50000Solar10YRO-TEL------PCEF Stanesti
830000000000000000000000078_002Electrica Energie Verde 1 SRLDismissedProduction unavailability2022-04-27 08:00:002022-04-27 09:00:00Planned2021-07-23 11:07:35MW1.200005.600007.50000Solar10YRO-TEL------PCEF Stanesti
840000000000000000000000079_002Electrica Energie Verde 1 SRLDismissedProduction unavailability2022-04-28 08:00:002022-04-28 09:00:00Planned2021-07-26 06:15:51MW1.200005.600007.50000Solar10YRO-TEL------PCEF Stanesti
850000000000000000000000085_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2021-12-13 10:00:002021-12-13 16:00:00Planned2021-12-03 11:32:56MW2.264404.535607.50000Solar10YRO-TEL------PCEF Stanesti
860000000000000000000000086_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2021-12-14 10:00:002021-12-16 16:00:00Planned2021-12-03 11:37:12MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
870000000000000000000000087_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2021-12-15 10:00:002021-12-15 16:00:00Planned2021-12-03 11:39:52MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
880000000000000000000000088_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2021-12-16 10:00:002021-12-16 14:00:00Planned2021-12-03 11:42:26MW6.800000.000007.50000Solar10YRO-TEL------PCEF Stanesti
890000000000000000000000089_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-02-01 08:00:002022-02-01 16:00:00Planned2022-01-27 11:55:01MW6.800000.000007.50000Solar10YRO-TEL------PCEF Stanesti
970000000000000000000000097_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-11-07 10:00:002022-11-07 16:00:00Planned2022-09-20 08:51:32MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
980000000000000000000000098_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-11-08 10:00:002022-11-08 16:00:00Planned2022-09-20 08:57:20MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
990000000000000000000000099_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-11-09 10:00:002022-11-09 16:00:00Planned2022-09-20 09:00:13MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
1000000000000000000000000100_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-11-10 10:00:002022-11-10 14:00:00Planned2022-09-20 09:05:04MW6.800000.000007.50000Solar10XRO-TEL------2CEF Stanesti
760000000000000000000000076_001Energie Wasser BernInactiveProduction unavailability2021-09-01 00:00:002021-10-01 00:00:00Planned2021-07-08 08:14:13MW43.500000.0000043.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
900000000000000000000000090_001Energie Wasser BernInactiveProduction unavailability2022-09-05 07:00:002022-09-23 17:00:00Planned2022-02-08 08:38:49MW43.500000.0000043.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
1570000000000000000000000157_001Energie Wasser BernActiveProduction unavailability2024-09-08 07:00:002024-09-19 17:00:00Planned2023-06-19 05:50:06MW43.500000.0000043.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
1580000000000000000000000158_001Energie Wasser BernActiveProduction unavailability2025-08-10 07:00:002025-09-18 17:00:00Planned2023-06-19 05:53:02MW43.500000.0000043.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
770000000000000000000000077_001Energieversorgung Schwerin GmbH und Co. Erzeugung KGInactiveProduction unavailability2021-05-01 00:00:002023-04-01 00:00:00Planned2021-07-08 09:16:19MW40.000000.0000040.00000Fossil Gas10YDE-VE-------2HKW Süd
1020000000000000000000000102_001Ineos oxide utilities NVInactiveProduction unavailability2023-08-28 00:00:002023-11-07 00:00:00Planned2023-01-30 09:43:50MW50.0000089.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1030000000000000000000000103_001Ineos oxide utilities NVInactiveProduction unavailability2023-09-04 00:00:002023-09-23 00:00:00Planned2023-01-30 09:59:15MW46.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
Showing 1-5 of 5 items.
 IDMessage IDMarket Participant NameEvent StatusEvent StartEvent StopPublication date/timeRemarks
 
 
×
×
×
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.

The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh.