ID | Message ID | Market Participant Name | Event Status | Type of Event | Event Start | Event Stop | Type of Unavailability | Publication date/time | Unit of Measurement | Unavailable Capacity | Available Capacity | Technical Capacity | Balancing Zone 1 | Affected Asset Name | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| |||||||||||||
33 | 0000000000000000000000033_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-01-17 08:00:00 | 2022-03-25 16:00:00 | Planned | 2022-01-03 16:52:30 | kWh/h | 750750.00000 | 1524250.00000 | 2275000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
34 | 0000000000000000000000034_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-01-17 08:00:00 | 2022-03-25 16:00:00 | Planned | 2022-01-03 16:52:47 | kWh/h | 631950.00000 | 1283050.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
37 | 0000000000000000000000037_001 | MET Speicher GmbH | Inactive | Other unavailability | 2022-09-21 08:00:00 | 2022-09-21 18:00:00 | Planned | 2022-01-03 16:53:25 | kWh/h | 419000.00000 | 0.00000 | 419000.00000 | 21YNL----TTF---1 | UGS Etzel-ESE MET | |
39 | 0000000000000000000000039_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-05-26 06:00:00 | 2022-07-22 18:00:00 | Planned | 2022-03-17 08:54:32 | GWh | 68.44000 | 1373.56000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
40 | 0000000000000000000000040_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-05-26 06:00:00 | 2022-07-22 18:00:00 | Planned | 2022-03-17 08:54:49 | GWh | 24.97000 | 1417.03000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
41 | 0000000000000000000000041_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-03-23 06:00:00 | 2022-03-24 18:00:00 | Planned | 2022-03-17 08:23:25 | kWh/h | 2063000.00000 | 0.00000 | 2063000.00000 | 37Y005053MH0000R | UGS Reckrod | |
42 | 0000000000000000000000042_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-03-23 06:00:00 | 2022-03-24 18:00:00 | Planned | 2022-03-17 08:23:50 | kWh/h | 957000.00000 | 170000.00000 | 1127000.00000 | 37Y005053MH0000R | UGS Reckrod | |
43 | 0000000000000000000000043_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-07-11 06:00:00 | 2022-07-15 16:00:00 | Planned | 2022-04-25 15:18:56 | kWh/h | 1031000.00000 | 0.00000 | 1031000.00000 | 37Y005053MH0000R | UGS Reckrod | |
44 | 0000000000000000000000044_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-07-18 06:00:00 | 2022-07-22 16:00:00 | Planned | 2022-04-25 15:19:50 | kWh/h | 515500.00000 | 515500.00000 | 1031000.00000 | 37Y005053MH0000R | UGS Reckrod | |
45 | 0000000000000000000000045_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-07-18 06:00:00 | 2022-07-22 16:00:00 | Planned | 2022-04-25 15:20:44 | kWh/h | 1031500.00000 | 1031500.00000 | 2063000.00000 | 37Y005053MH0000R | UGS Reckrod | |
46 | 0000000000000000000000046_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-07-25 06:00:00 | 2022-07-29 16:00:00 | Planned | 2022-04-25 15:21:37 | kWh/h | 515500.00000 | 515500.00000 | 1031000.00000 | 37Y005053MH0000R | UGS Reckrod | |
47 | 0000000000000000000000047_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-07-25 06:00:00 | 2022-07-29 16:00:00 | Planned | 2022-04-25 15:22:28 | kWh/h | 1031500.00000 | 1031500.00000 | 2063000.00000 | 37Y005053MH0000R | UGS Reckrod | |
49 | 0000000000000000000000035_002 | MET Speicher GmbH | Inactive | Storage unavailability | 2022-03-17 18:00:00 | 2022-05-20 16:00:00 | Planned | 2022-04-28 13:06:39 | GWh | 11.75600 | 1473.24400 | 1485.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
50 | 0000000000000000000000036_002 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-03-17 18:00:00 | 2022-05-20 16:00:00 | Planned | 2022-04-28 13:07:34 | kWh/h | 95750.00000 | 1819250.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
54 | 0000000000000000000000051_004 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-05-13 00:00:00 | 2022-05-16 00:00:00 | Planned | 2022-05-13 12:45:08 | kWh/h | 529000.00000 | 450000.00000 | 979000.00000 | 37Y005053MH0000R | UGS Reckrod | |
55 | 0000000000000000000000055_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-05-16 00:00:00 | 2022-05-17 00:00:00 | Planned | 2022-05-13 12:49:10 | kWh/h | 679000.00000 | 300000.00000 | 979000.00000 | 37Y005053MH0000R | UGS Reckrod | |
61 | 0000000000000000000000057_002 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-05-17 00:00:00 | 2022-05-18 06:00:00 | Planned | 2022-05-17 14:12:06 | kWh/h | 754000.00000 | 225000.00000 | 979000.00000 | 37Y005053MH0000R | UGS Reckrod | |
62 | 0000000000000000000000062_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-05-18 06:00:00 | 2022-05-18 14:00:00 | Planned | 2022-05-17 14:14:20 | kWh/h | 979000.00000 | 0.00000 | 979000.00000 | 37Y005053MH0000R | UGS Reckrod | |
63 | 0000000000000000000000063_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-05-18 14:00:00 | 2022-05-19 06:00:00 | Planned | 2022-05-17 14:15:59 | kWh/h | 479000.00000 | 500000.00000 | 979000.00000 | 37Y005053MH0000R | UGS Reckrod | |
67 | 0000000000000000000000064_002 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-05-19 06:00:00 | 2022-05-21 06:00:00 | Planned | 2022-05-19 14:09:03 | kWh/h | 491000.00000 | 483000.00000 | 974000.00000 | 37Y005053MH0000R | UGS Reckrod |
ID | Message ID | Market Participant Name | Event Status | Type of Event | Event Start | Event Stop | Type of Unavailability | Publication date/time | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Fuel Type | Bidding Zone | Affected Asset Name | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| ||||||||||||||
157 | 0000000000000000000000157_001 | Energie Wasser Bern | Active | Production unavailability | 2024-09-08 07:00:00 | 2024-09-19 17:00:00 | Planned | 2023-06-19 05:50:06 | MW | 43.50000 | 0.00000 | 43.50000 | Fossil Gas | 10YCH-SWISSGRIDZ | GUD Energiezentrale Forsthaus | |
158 | 0000000000000000000000158_001 | Energie Wasser Bern | Active | Production unavailability | 2025-08-10 07:00:00 | 2025-09-18 17:00:00 | Planned | 2023-06-19 05:53:02 | MW | 43.50000 | 0.00000 | 43.50000 | Fossil Gas | 10YCH-SWISSGRIDZ | GUD Energiezentrale Forsthaus | |
78 | 0000000000000000000000078_001 | Electrica Energie Verde 1 SRL | Dismissed | Production unavailability | 2022-04-27 08:00:00 | 2022-04-27 09:00:00 | Planned | 2021-07-13 09:38:38 | MW | 1.20000 | 5.60000 | 7.50000 | Solar | 10YRO-TEL------P | CEF Stanesti | |
79 | 0000000000000000000000079_001 | Electrica Energie Verde 1 SRL | Dismissed | Production unavailability | 2022-04-28 08:00:00 | 2022-04-28 09:00:00 | Planned | 2021-07-13 09:42:02 | MW | 1.20000 | 5.60000 | 7.50000 | Solar | 10YRO-TEL------P | CEF Stanesti | |
83 | 0000000000000000000000078_002 | Electrica Energie Verde 1 SRL | Dismissed | Production unavailability | 2022-04-27 08:00:00 | 2022-04-27 09:00:00 | Planned | 2021-07-23 11:07:35 | MW | 1.20000 | 5.60000 | 7.50000 | Solar | 10YRO-TEL------P | CEF Stanesti | |
84 | 0000000000000000000000079_002 | Electrica Energie Verde 1 SRL | Dismissed | Production unavailability | 2022-04-28 08:00:00 | 2022-04-28 09:00:00 | Planned | 2021-07-26 06:15:51 | MW | 1.20000 | 5.60000 | 7.50000 | Solar | 10YRO-TEL------P | CEF Stanesti | |
106 | 0000000000000000000000106_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-02-12 22:35:00 | 2023-02-13 23:55:00 | Unplanned | 2023-02-12 21:26:46 | MW | 9.00000 | 130.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
107 | 0000000000000000000000106_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-02-12 22:35:00 | 2023-02-13 23:55:00 | Unplanned | 2023-02-13 08:26:34 | MW | 9.00000 | 130.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
108 | 0000000000000000000000108_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-03-09 20:00:00 | 2023-03-10 12:00:00 | Unplanned | 2023-03-09 19:08:04 | MW | 33.00000 | 106.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
109 | 0000000000000000000000108_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-03-09 20:00:00 | 2023-03-10 12:00:00 | Unplanned | 2023-03-10 09:58:07 | MW | 33.00000 | 106.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
110 | 0000000000000000000000108_003 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-03-09 20:00:00 | 2023-03-10 12:00:00 | Unplanned | 2023-03-10 10:00:18 | MW | 33.00000 | 106.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
112 | 0000000000000000000000112_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-03-17 20:00:00 | 2023-03-21 00:00:00 | Unplanned | 2023-03-17 20:17:01 | MW | 94.00000 | 45.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
113 | 0000000000000000000000112_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-03-17 20:00:00 | 2023-03-20 15:00:00 | Unplanned | 2023-03-20 13:56:12 | MW | 94.00000 | 45.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
115 | 0000000000000000000000112_003 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-03-17 20:00:00 | 2023-03-20 15:00:00 | Unplanned | 2023-03-20 14:01:22 | MW | 94.00000 | 45.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
118 | 0000000000000000000000118_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-03-23 05:00:00 | 2023-03-24 06:00:00 | Unplanned | 2023-03-23 04:09:50 | MW | 96.00000 | 43.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
119 | 0000000000000000000000118_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-03-23 05:00:00 | 2023-03-27 00:00:00 | Unplanned | 2023-03-23 09:57:49 | MW | 96.00000 | 43.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
120 | 0000000000000000000000118_003 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-03-23 05:00:00 | 2023-03-24 18:00:00 | Unplanned | 2023-03-24 16:35:48 | MW | 96.00000 | 43.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
121 | 0000000000000000000000121_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-04-10 20:00:00 | 2023-04-15 00:00:00 | Planned | 2023-04-03 09:09:43 | MW | 87.00000 | 52.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
122 | 0000000000000000000000121_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-04-16 18:00:00 | 2023-04-26 00:00:00 | Planned | 2023-04-06 13:28:24 | MW | 87.00000 | 52.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
123 | 0000000000000000000000121_003 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-04-16 00:00:00 | 2023-04-26 00:00:00 | Planned | 2023-04-14 08:06:45 | MW | 87.00000 | 52.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK |
ID | Message ID | Market Participant Name | Event Status | Event Start | Event Stop | Publication date/time | Remarks | |
---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| ||||||
12 | 0000000000000000000000012_001 | Swissgrid AG | Dismissed | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-13 15:04:43 | Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices. | |
14 | 0000000000000000000000012_002 | Swissgrid AG | Dismissed | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-14 17:40:34 | Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices. | |
10 | 0000000000000000000000010_001 | Swissgrid AG | Inactive | 2020-12-21 00:00:00 | 2022-01-05 00:00:00 | 2021-12-23 09:12:31 | A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh. The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh. | |
11 | 0000000000000000000000011_001 | Swissgrid AG | Inactive | 2022-12-01 00:00:00 | 2023-05-15 23:55:00 | 2022-10-25 13:42:46 | Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html | |
13 | 0000000000000000000000013_001 | Swissgrid AG | Inactive | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-14 17:27:59 | UPDATE (reduced amount of energy) Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices. |