Showing 1-20 of 74 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityTechnical CapacityBalancing Zone 1Affected Asset Name
 
 
 
×
×
 
×
 
 
160000000000000000000000016_001astora GmbH and Co. KGDismissedInjection unavailability2020-10-05 06:00:002020-10-17 18:00:00Planned2020-06-10 09:31:00KWh/h14365000.000000.0000014365000.0000037Z0000000052293Rehden natural gas storage facility
170000000000000000000000016_002astora GmbH and Co. KGInactiveInjection unavailability2020-11-02 08:00:002020-12-11 18:00:00Planned2020-06-10 09:41:22KWh/h14365000.000000.0000014365000.0000037Z0000000052293Rehden natural gas storage facility
180000000000000000000000018_001astora GmbH and Co. KGDismissedWithdrawal unavailability2020-10-05 06:00:002020-10-17 18:00:00Planned2020-06-10 09:51:11KWh/h22100000.000000.0000022100000.0000037Z0000000052293Rehden natural gas storage facility
190000000000000000000000018_002astora GmbH and Co. KGDismissedWithdrawal unavailability2020-10-05 06:00:002020-10-17 18:00:00Planned2020-06-10 09:57:00KWh/h22100000.000000.0000022100000.0000037Z0000000052293Rehden natural gas storage facility
200000000000000000000000020_001astora GmbH and Co. KGInactiveInjection unavailability2021-10-04 06:00:002021-10-15 18:00:00Planned2021-05-25 12:09:00KWh/h14365000.000000.0000014365000.0000037Z0000000052293Rehden natural gas storage facility
210000000000000000000000021_001astora GmbH and Co. KGInactiveWithdrawal unavailability2021-10-04 06:00:002021-10-15 18:00:00Planned2021-05-26 19:21:51KWh/h22100000.000000.0000022100000.0000037Z0000000052293Rehden natural gas storage facility
220000000000000000000000022_001astora GmbH and Co. KGDismissedInjection unavailability2021-10-26 16:00:002021-11-17 22:00:00Planned2021-05-28 08:06:38KWh/h3099249.000001033083.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
230000000000000000000000023_001astora GmbH and Co. KGInactiveInjection unavailability2021-10-19 16:00:002021-10-26 16:00:00Planned2021-05-28 08:11:06KWh/h2066166.000002066166.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
240000000000000000000000022_002astora GmbH and Co. KGInactiveInjection unavailability2021-10-26 16:00:002021-11-17 22:00:00Planned2021-05-28 08:18:49KWh/h1033083.000003099249.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
250000000000000000000000025_001astora GmbH and Co. KGDismissedOffshore pipeline unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-05-29 06:17:08KWh/h4132332.000000.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
260000000000000000000000025_002astora GmbH and Co. KGInactiveInjection unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-05-30 15:14:10KWh/h4132332.000000.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
270000000000000000000000027_001astora GmbH and Co. KGDismissedWithdrawal unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-05-30 15:20:09KWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
280000000000000000000000027_002astora GmbH and Co. KGDismissedWithdrawal unavailability2021-10-04 07:00:002021-10-19 16:05:00Planned2021-06-01 06:06:56KWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
290000000000000000000000027_003astora GmbH and Co. KGInactiveWithdrawal unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-06-04 12:43:09kWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
300000000000000000000000030_001astora GmbH and Co. KGInactiveInjection unavailability2021-06-07 07:00:002021-06-09 16:00:00Planned2021-06-04 12:48:20kWh/h4132332.000000.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
310000000000000000000000031_001astora GmbH and Co. KGInactiveWithdrawal unavailability2021-06-07 07:00:002021-06-09 16:00:00Planned2021-06-07 22:59:18kWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
320000000000000000000000032_001MET Speicher GmbHInactiveInjection unavailability2022-01-03 08:00:002022-01-16 16:00:00Planned2022-01-03 16:51:54kWh/h750750.000001524250.000002275000.0000037Y005053MH0000RUGS Etzel-ESE MET
330000000000000000000000033_001MET Speicher GmbHInactiveInjection unavailability2022-01-17 08:00:002022-03-25 16:00:00Planned2022-01-03 16:52:30kWh/h750750.000001524250.000002275000.0000037Y005053MH0000RUGS Etzel-ESE MET
340000000000000000000000034_001MET Speicher GmbHInactiveWithdrawal unavailability2022-01-17 08:00:002022-03-25 16:00:00Planned2022-01-03 16:52:47kWh/h631950.000001283050.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
360000000000000000000000036_001MET Speicher GmbHDismissedWithdrawal unavailability2022-03-17 18:00:002022-05-13 16:00:00Planned2022-01-03 16:53:15kWh/h95750.000001819250.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
Showing 1-20 of 143 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityInstalled CapacityFuel TypeBidding ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
760000000000000000000000076_001Energie Wasser BernInactiveProduction unavailability2021-09-01 00:00:002021-10-01 00:00:00Planned2021-07-08 08:14:13MW43.500000.0000043.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
770000000000000000000000077_001Energieversorgung Schwerin GmbH und Co. Erzeugung KGInactiveProduction unavailability2021-05-01 00:00:002023-04-01 00:00:00Planned2021-07-08 09:16:19MW40.000000.0000040.00000Fossil Gas10YDE-VE-------2HKW Süd
780000000000000000000000078_001Electrica Energie Verde 1 SRLDismissedProduction unavailability2022-04-27 08:00:002022-04-27 09:00:00Planned2021-07-13 09:38:38MW1.200005.600007.50000Solar10YRO-TEL------PCEF Stanesti
790000000000000000000000079_001Electrica Energie Verde 1 SRLDismissedProduction unavailability2022-04-28 08:00:002022-04-28 09:00:00Planned2021-07-13 09:42:02MW1.200005.600007.50000Solar10YRO-TEL------PCEF Stanesti
800000000000000000000000080_001Stadtwerke Rostock AGInactiveProduction unavailability2021-06-09 00:00:002021-08-01 00:00:00Planned2021-07-15 10:08:48MW108.000000.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
830000000000000000000000078_002Electrica Energie Verde 1 SRLDismissedProduction unavailability2022-04-27 08:00:002022-04-27 09:00:00Planned2021-07-23 11:07:35MW1.200005.600007.50000Solar10YRO-TEL------PCEF Stanesti
840000000000000000000000079_002Electrica Energie Verde 1 SRLDismissedProduction unavailability2022-04-28 08:00:002022-04-28 09:00:00Planned2021-07-26 06:15:51MW1.200005.600007.50000Solar10YRO-TEL------PCEF Stanesti
850000000000000000000000085_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2021-12-13 10:00:002021-12-13 16:00:00Planned2021-12-03 11:32:56MW2.264404.535607.50000Solar10YRO-TEL------PCEF Stanesti
860000000000000000000000086_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2021-12-14 10:00:002021-12-16 16:00:00Planned2021-12-03 11:37:12MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
870000000000000000000000087_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2021-12-15 10:00:002021-12-15 16:00:00Planned2021-12-03 11:39:52MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
880000000000000000000000088_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2021-12-16 10:00:002021-12-16 14:00:00Planned2021-12-03 11:42:26MW6.800000.000007.50000Solar10YRO-TEL------PCEF Stanesti
890000000000000000000000089_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-02-01 08:00:002022-02-01 16:00:00Planned2022-01-27 11:55:01MW6.800000.000007.50000Solar10YRO-TEL------PCEF Stanesti
900000000000000000000000090_001Energie Wasser BernInactiveProduction unavailability2022-09-05 07:00:002022-09-23 17:00:00Planned2022-02-08 08:38:49MW43.500000.0000043.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
910000000000000000000000091_001Stadtwerke Rostock AGInactiveProduction unavailability2022-04-18 00:00:002022-05-27 23:55:00Planned2022-04-19 12:16:35MW36.0000072.0000036.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
920000000000000000000000092_001Stadtwerke Rostock AGInactiveProduction unavailability2022-04-18 00:00:002022-05-27 23:55:00Planned2022-04-19 12:24:57MW36.0000072.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
930000000000000000000000093_001Stadtwerke Rostock AGInactiveProduction unavailability2022-05-28 00:00:002022-06-20 23:55:00Planned2022-05-20 05:42:18MW36.0000072.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
950000000000000000000000095_001Stadtwerke Rostock AGInactiveProduction unavailability2022-06-10 00:00:002022-06-20 23:55:00Planned2022-06-09 05:36:11MW108.000000.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
970000000000000000000000097_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-11-07 10:00:002022-11-07 16:00:00Planned2022-09-20 08:51:32MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
980000000000000000000000098_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-11-08 10:00:002022-11-08 16:00:00Planned2022-09-20 08:57:20MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
990000000000000000000000099_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-11-09 10:00:002022-11-09 16:00:00Planned2022-09-20 09:00:13MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
Showing 1-5 of 5 items.
 IDMessage IDMarket Participant NameEvent StatusEvent StartEvent StopPublication date/timeRemarks
 
 
×
×
×
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.

The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh.