 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityTechnical CapacityBalancing Zone 1Affected Asset Name
 
 
 
×
×
 
×
 
 
890000000000000000000000089_001MET Speicher GmbHInactiveInjection unavailability2023-02-28 18:00:002023-03-15 18:00:00Planned2023-02-28 10:40:36GWh/d24.744000.0000024.7440037Y005053MH0000RUGS Reckrod
870000000000000000000000087_001MET Speicher GmbHInactiveWithdrawal unavailability2022-11-28 06:00:002022-11-30 06:00:00Planned2022-11-27 10:09:25GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
880000000000000000000000088_001MET Speicher GmbHInactiveWithdrawal unavailability2022-12-06 06:00:002022-12-08 16:00:00Planned2022-12-05 14:34:56GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
680000000000000000000000068_001MET Speicher GmbHInactiveInjection unavailability2022-05-23 06:00:002022-05-24 06:00:00Planned2022-05-20 07:18:54kWh/h639.00000333.00000972.0000037Y005053MH0000RUGS Reckrod
390000000000000000000000039_001MET Speicher GmbHInactiveInjection unavailability2022-05-26 06:00:002022-07-22 18:00:00Planned2022-03-17 08:54:32GWh68.440001373.560001442.0000037Y005053MH0000RUGS Etzel-ESE MET
400000000000000000000000040_001MET Speicher GmbHInactiveWithdrawal unavailability2022-05-26 06:00:002022-07-22 18:00:00Planned2022-03-17 08:54:49GWh24.970001417.030001442.0000037Y005053MH0000RUGS Etzel-ESE MET
700000000000000000000000038_004MET Speicher GmbHInactiveStorage unavailability2022-10-09 06:00:002022-10-15 18:00:00Planned2022-09-23 09:11:28GWh1442.000000.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
760000000000000000000000076_001MET Speicher GmbHDismissedStorage unavailability2023-02-10 08:00:002023-03-15 08:00:00Planned2022-11-11 15:55:29GWh17.000001425.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
780000000000000000000000078_001MET Speicher GmbHDismissedStorage unavailability2023-03-15 08:00:002023-04-04 16:00:00Planned2022-11-11 15:56:03GWh32.000001410.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
800000000000000000000000080_001MET Speicher GmbHDismissedStorage unavailability2023-04-04 16:00:002023-05-24 16:00:00Planned2022-11-11 15:56:34GWh15.000001427.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
820000000000000000000000076_002MET Speicher GmbHInactiveStorage unavailability2023-02-10 08:00:002023-03-17 08:00:00Planned2022-11-16 16:39:02GWh17.000001425.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
840000000000000000000000078_002MET Speicher GmbHInactiveStorage unavailability2023-03-17 08:00:002023-04-04 16:00:00Planned2022-11-16 16:40:51GWh32.000001410.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
860000000000000000000000080_002MET Speicher GmbHInactiveStorage unavailability2023-04-04 16:00:002023-05-09 16:00:00Planned2022-11-16 16:42:06GWh15.000001427.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
480000000000000000000000048_001MET Speicher GmbHDismissedStorage unavailability2022-10-17 06:00:002022-11-11 16:00:00Planned2022-04-25 15:23:18GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
720000000000000000000000048_002MET Speicher GmbHDismissedStorage unavailability2022-10-18 06:00:002022-11-11 16:00:00Planned2022-10-13 06:22:49GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
730000000000000000000000048_003MET Speicher GmbHInactiveStorage unavailability2022-10-18 06:00:002022-11-04 06:00:00Planned2022-11-03 18:13:45GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
350000000000000000000000035_001MET Speicher GmbHDismissedStorage unavailability2022-03-17 18:00:002022-05-13 16:00:00Planned2022-01-03 16:53:00GWh11.756001473.244001485.0000037Y005053MH0000RUGS Etzel-ESE MET
380000000000000000000000038_001MET Speicher GmbHDismissedStorage unavailability2022-10-09 06:00:002022-10-15 18:00:00Planned2022-01-03 16:53:35GWh1485.000000.000001485.0000037Y005053MH0000RUGS Etzel-ESE MET
490000000000000000000000035_002MET Speicher GmbHInactiveStorage unavailability2022-03-17 18:00:002022-05-20 16:00:00Planned2022-04-28 13:06:39GWh11.756001473.244001485.0000037Y005053MH0000RUGS Etzel-ESE MET
560000000000000000000000038_002MET Speicher GmbHDismissedStorage unavailability2022-10-07 06:00:002022-10-15 18:00:00Planned2022-05-16 07:16:06GWh1485.000000.000001485.0000037Y005053MH0000RUGS Etzel-ESE MET
Showing 21-40 of 143 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityInstalled CapacityFuel TypeBidding ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
2030000000000000000000000203_001Ineos oxide utilities NVDismissedProduction unavailability2024-01-10 00:00:002024-01-12 00:00:00Planned2024-01-05 07:43:09MW50.0000089.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2020000000000000000000000202_001Ineos oxide utilities NVDismissedProduction unavailability2024-01-05 08:40:002024-01-10 00:00:00Unplanned2024-01-05 07:36:25MW30.00000109.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2010000000000000000000000199_003Ineos oxide utilities NVInactiveProduction unavailability2023-12-23 10:00:002024-01-03 00:00:00Unplanned2023-12-26 11:25:37MW30.00000109.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2000000000000000000000000199_002Ineos oxide utilities NVDismissedProduction unavailability2023-12-23 10:00:002023-12-28 00:00:00Unplanned2023-12-26 09:06:02MW30.00000109.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1990000000000000000000000199_001Ineos oxide utilities NVDismissedProduction unavailability2023-12-23 10:00:002023-12-27 00:00:00Unplanned2023-12-23 08:52:04MW30.00000109.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1980000000000000000000000196_002Ineos oxide utilities NVInactiveProduction unavailability2023-12-09 00:00:002023-12-22 15:00:00Planned2023-12-22 18:17:40MW46.0000093.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1970000000000000000000000197_001Ineos oxide utilities NVInactiveProduction unavailability2023-12-14 08:00:002023-12-15 00:00:00Unplanned2023-12-14 07:53:19MW95.0000044.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1960000000000000000000000196_001Ineos oxide utilities NVDismissedProduction unavailability2023-12-09 00:00:002024-01-01 00:00:00Planned2023-12-09 09:47:45MW46.0000093.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1950000000000000000000000164_006Ineos oxide utilities NVInactiveProduction unavailability2023-11-15 00:00:002023-12-09 00:00:00Planned2023-12-09 09:47:31MW98.0000041.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1940000000000000000000000164_005Ineos oxide utilities NVDismissedProduction unavailability2023-11-15 00:00:002024-01-01 00:00:00Planned2023-12-07 12:45:25MW98.0000041.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1930000000000000000000000193_001Ineos oxide utilities NVInactiveProduction unavailability2023-12-07 15:00:002023-12-09 00:00:00Planned2023-12-07 10:02:15MW92.5000046.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1920000000000000000000000192_001Ineos oxide utilities NVInactiveProduction unavailability2023-12-04 16:00:002023-12-05 17:00:00Unplanned2023-12-04 15:37:15MW92.5000046.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1910000000000000000000000191_001Ineos oxide utilities NVInactiveProduction unavailability2023-11-23 10:00:002023-11-25 00:00:00Planned2023-11-22 08:53:37MW139.000000.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1900000000000000000000000187_002Ineos oxide utilities NVInactiveProduction unavailability2023-11-23 14:00:002023-11-29 00:00:00Planned2023-11-20 09:07:16MW93.0000046.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1890000000000000000000000186_002Ineos oxide utilities NVInactiveProduction unavailability2023-11-22 18:00:002023-11-23 14:00:00Planned2023-11-20 09:04:52MW101.0000038.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1880000000000000000000000180_006Ineos oxide utilities NVInactiveProduction unavailability2023-11-11 16:00:002023-11-22 18:00:00Unplanned2023-11-20 09:03:56MW117.0000022.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1870000000000000000000000187_001Ineos oxide utilities NVDismissedProduction unavailability2023-11-22 14:00:002023-11-29 00:00:00Planned2023-11-17 12:32:09MW93.0000046.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1860000000000000000000000186_001Ineos oxide utilities NVDismissedProduction unavailability2023-11-21 14:00:002023-11-22 14:00:00Planned2023-11-17 12:29:05MW101.0000038.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1850000000000000000000000180_005Ineos oxide utilities NVDismissedProduction unavailability2023-11-11 16:00:002023-11-21 14:00:00Unplanned2023-11-17 12:26:36MW117.0000022.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1840000000000000000000000164_004Ineos oxide utilities NVDismissedProduction unavailability2023-11-15 00:00:002023-12-11 00:00:00Planned2023-11-17 12:24:05MW98.0000041.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
Showing 1-5 of 5 items.
 IDMessage IDMarket Participant NameEvent StatusEvent StartEvent StopPublication date/timeRemarks
 
 
×
×
×
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.

The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh.