| ID | Message ID | Market Participant Name | Event Status | Type of Event | Event Start | Event Stop | Type of Unavailability | Publication date/time | Unit of Measurement | Unavailable Capacity | Available Capacity | Technical Capacity | Balancing Zone 1 | Affected Asset Name | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| |||||||||||||
| 89 | 0000000000000000000000089_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2023-02-28 18:00:00 | 2023-03-15 18:00:00 | Planned | 2023-02-28 10:40:36 | GWh/d | 24.74400 | 0.00000 | 24.74400 | 37Y005053MH0000R | UGS Reckrod | |
| 88 | 0000000000000000000000088_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-12-06 06:00:00 | 2022-12-08 16:00:00 | Planned | 2022-12-05 14:34:56 | GWh/d | 49.50000 | 0.00000 | 49.50000 | 37Y005053MH0000R | UGS Reckrod | |
| 87 | 0000000000000000000000087_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-11-28 06:00:00 | 2022-11-30 06:00:00 | Planned | 2022-11-27 10:09:25 | GWh/d | 49.50000 | 0.00000 | 49.50000 | 37Y005053MH0000R | UGS Reckrod | |
| 86 | 0000000000000000000000080_002 | MET Speicher GmbH | Inactive | Storage unavailability | 2023-04-04 16:00:00 | 2023-05-09 16:00:00 | Planned | 2022-11-16 16:42:06 | GWh | 15.00000 | 1427.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
| 85 | 0000000000000000000000079_002 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2023-04-04 16:00:00 | 2023-05-09 16:00:00 | Planned | 2022-11-16 16:41:38 | kWh/h | 70000.00000 | 1845000.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
| 84 | 0000000000000000000000078_002 | MET Speicher GmbH | Inactive | Storage unavailability | 2023-03-17 08:00:00 | 2023-04-04 16:00:00 | Planned | 2022-11-16 16:40:51 | GWh | 32.00000 | 1410.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
| 83 | 0000000000000000000000077_002 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2023-03-17 08:00:00 | 2023-04-04 16:00:00 | Planned | 2022-11-16 16:40:32 | kWh/h | 155500.00000 | 1759500.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
| 82 | 0000000000000000000000076_002 | MET Speicher GmbH | Inactive | Storage unavailability | 2023-02-10 08:00:00 | 2023-03-17 08:00:00 | Planned | 2022-11-16 16:39:02 | GWh | 17.00000 | 1425.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
| 81 | 0000000000000000000000075_002 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2023-02-10 08:00:00 | 2023-03-17 08:00:00 | Planned | 2022-11-16 16:37:23 | kWh/h | 85500.00000 | 1829500.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
| 80 | 0000000000000000000000080_001 | MET Speicher GmbH | Dismissed | Storage unavailability | 2023-04-04 16:00:00 | 2023-05-24 16:00:00 | Planned | 2022-11-11 15:56:34 | GWh | 15.00000 | 1427.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
| 79 | 0000000000000000000000079_001 | MET Speicher GmbH | Dismissed | Withdrawal unavailability | 2023-04-04 16:00:00 | 2023-05-24 16:00:00 | Planned | 2022-11-11 15:56:21 | kWh/h | 70000.00000 | 1845000.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
| 78 | 0000000000000000000000078_001 | MET Speicher GmbH | Dismissed | Storage unavailability | 2023-03-15 08:00:00 | 2023-04-04 16:00:00 | Planned | 2022-11-11 15:56:03 | GWh | 32.00000 | 1410.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
| 77 | 0000000000000000000000077_001 | MET Speicher GmbH | Dismissed | Withdrawal unavailability | 2023-03-15 08:00:00 | 2023-04-04 16:00:00 | Planned | 2022-11-11 15:55:50 | kWh/h | 155500.00000 | 1759500.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
| 76 | 0000000000000000000000076_001 | MET Speicher GmbH | Dismissed | Storage unavailability | 2023-02-10 08:00:00 | 2023-03-15 08:00:00 | Planned | 2022-11-11 15:55:29 | GWh | 17.00000 | 1425.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
| 75 | 0000000000000000000000075_001 | MET Speicher GmbH | Dismissed | Withdrawal unavailability | 2023-02-10 08:00:00 | 2023-03-15 08:00:00 | Planned | 2022-11-11 15:55:15 | kWh/h | 85500.00000 | 1829500.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
| 74 | 0000000000000000000000074_001 | MET Speicher GmbH | Inactive | Transmission system unavailability | 2023-09-20 08:00:00 | 2023-09-20 18:00:00 | Planned | 2022-11-11 14:59:13 | kWh/h | 418977.00000 | 0.00000 | 418977.00000 | 21YNL----TTF---1 | UGS Etzel-ESE MET | |
| 73 | 0000000000000000000000048_003 | MET Speicher GmbH | Inactive | Storage unavailability | 2022-10-18 06:00:00 | 2022-11-04 06:00:00 | Planned | 2022-11-03 18:13:45 | GWh | 1461.00000 | 0.00000 | 1461.00000 | 37Y005053MH0000R | UGS Reckrod | |
| 72 | 0000000000000000000000048_002 | MET Speicher GmbH | Dismissed | Storage unavailability | 2022-10-18 06:00:00 | 2022-11-11 16:00:00 | Planned | 2022-10-13 06:22:49 | GWh | 1461.00000 | 0.00000 | 1461.00000 | 37Y005053MH0000R | UGS Reckrod | |
| 71 | 0000000000000000000000058_002 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-10-10 08:00:00 | 2022-12-16 16:00:00 | Planned | 2022-09-23 09:17:44 | kWh/h | 752000.00000 | 1505000.00000 | 2257000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
| 70 | 0000000000000000000000038_004 | MET Speicher GmbH | Inactive | Storage unavailability | 2022-10-09 06:00:00 | 2022-10-15 18:00:00 | Planned | 2022-09-23 09:11:28 | GWh | 1442.00000 | 0.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET |
| ID | Message ID | Market Participant Name | Event Status | Type of Event | Event Start | Event Stop | Type of Unavailability | Publication date/time | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Fuel Type | Bidding Zone | Affected Asset Name | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| ||||||||||||||
| 416 | 0000000000000000000000411_005 | Ineos oxide utilities NV | Inactive | Production unavailability | 2025-10-30 06:05:00 | 2025-10-30 16:00:00 | Unplanned | 2025-10-30 12:08:51 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 414 | 0000000000000000000000411_004 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-30 06:05:00 | 2025-10-30 14:00:00 | Unplanned | 2025-10-30 10:20:22 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 413 | 0000000000000000000000411_003 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-30 06:05:00 | 2025-10-30 12:00:00 | Unplanned | 2025-10-30 10:20:05 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 412 | 0000000000000000000000411_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-30 06:05:00 | 2025-10-30 12:00:00 | Unplanned | 2025-10-30 10:18:23 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 411 | 0000000000000000000000411_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-30 06:05:00 | 2025-10-30 12:00:00 | Unplanned | 2025-10-30 05:51:22 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 409 | 0000000000000000000000405_003 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-21 16:00:00 | 2025-10-23 13:00:00 | Planned | 2025-10-23 11:09:11 | MW | 5.00000 | 134.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 407 | 0000000000000000000000405_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-21 16:00:00 | 2025-11-01 00:00:00 | Planned | 2025-10-21 14:20:27 | MW | 5.00000 | 134.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 405 | 0000000000000000000000405_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-21 16:00:00 | 2025-11-01 00:00:00 | Unplanned | 2025-10-21 14:20:10 | MW | 5.00000 | 134.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 403 | 0000000000000000000000401_003 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-15 21:25:00 | 2025-10-21 16:00:00 | Unplanned | 2025-10-21 14:18:04 | MW | 20.00000 | 119.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 402 | 0000000000000000000000401_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-15 21:25:00 | 2025-10-26 00:00:00 | Unplanned | 2025-10-16 07:56:09 | MW | 20.00000 | 119.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 401 | 0000000000000000000000401_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-15 21:25:00 | 2025-10-16 12:00:00 | Unplanned | 2025-10-15 19:29:52 | MW | 20.00000 | 119.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 399 | 0000000000000000000000397_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-14 13:00:00 | 2025-10-15 17:00:00 | Unplanned | 2025-10-14 11:02:56 | MW | 92.50000 | 46.50000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 397 | 0000000000000000000000397_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-14 13:00:00 | 2025-10-15 17:00:00 | Unplanned | 2025-10-14 08:17:11 | MW | 92.50000 | 46.50000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 396 | 0000000000000000000000391_004 | Ineos oxide utilities NV | Inactive | Production unavailability | 2025-10-02 14:00:00 | 2025-10-15 00:00:00 | Unplanned | 2025-10-13 13:50:48 | MW | 46.00000 | 93.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 394 | 0000000000000000000000391_003 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-02 14:00:00 | 2025-10-15 00:00:00 | Unplanned | 2025-10-13 13:50:07 | MW | 46.00000 | 93.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 393 | 0000000000000000000000391_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-02 14:00:00 | 2025-10-15 00:00:00 | Unplanned | 2025-10-06 08:31:19 | MW | 92.50000 | 46.50000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 391 | 0000000000000000000000391_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-10-02 14:00:00 | 2025-10-11 00:00:00 | Unplanned | 2025-10-02 11:49:45 | MW | 92.50000 | 46.50000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 390 | 0000000000000000000000390_001 | Ineos oxide utilities NV | Inactive | Production unavailability | 2025-10-01 10:00:00 | 2025-10-04 00:00:00 | Unplanned | 2025-10-01 08:05:31 | MW | 50.00000 | 89.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 389 | 0000000000000000000000389_001 | Ineos oxide utilities NV | Inactive | Production unavailability | 2025-09-28 20:30:00 | 2025-09-29 16:00:00 | Unplanned | 2025-09-28 18:24:23 | MW | 96.00000 | 43.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
| 388 | 0000000000000000000000386_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2025-09-27 10:00:00 | 2025-09-30 00:00:00 | Unplanned | 2025-09-28 18:20:47 | MW | 104.00000 | 35.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK |
| ID | Message ID | Market Participant Name | Event Status | Event Start | Event Stop | Publication date/time | Remarks | |
|---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| ||||||
| 18 | 0000000000000000000000018_001 | MET International AG | Active | 2025-07-17 00:00:00 | (not set) | 2025-07-29 15:55:33 | MET International AG's regasification capacity is available due to termination of the TUA by MET International AG pursuant to its terms. | |
| 16 | 0000000000000000000000016_001 | Swissgrid AG | Active | 2026-02-01 00:00:00 | 2026-05-15 23:55:00 | 2025-06-20 12:30:16 | Information about the Swiss hydropower reserve administrated by Swissgrid on behalf of the Swiss national regulator ElCom according to the Swiss Ordinance on the establishment of a hydropower reserve is available on the website of ElCom. Today ElCom fixed a total energy volume of 250 GWh for the coming winter period (01 February 2026 until 15 May 2026). See https://www.elcom.admin.ch/elcom/de/home/dokumentation/weisungen.html | |
| 15 | 0000000000000000000000015_001 | Swissgrid AG | Inactive | 2025-02-18 08:00:00 | 2025-02-18 10:00:00 | 2025-02-14 13:53:46 | Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with a thermal reserve power plant between 18/02/2025 08:00 and 18/02/2025 10:00. During this period, an excess of approx. 500 MWh will be fed into the grid, which may have an impact on prices. | |
| 14 | 0000000000000000000000012_002 | Swissgrid AG | Dismissed | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-14 17:40:34 | Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices. | |
| 13 | 0000000000000000000000013_001 | Swissgrid AG | Inactive | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-14 17:27:59 | UPDATE (reduced amount of energy) Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices. | |
| 12 | 0000000000000000000000012_001 | Swissgrid AG | Dismissed | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-13 15:04:43 | Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices. | |
| 11 | 0000000000000000000000011_001 | Swissgrid AG | Inactive | 2022-12-01 00:00:00 | 2023-05-15 23:55:00 | 2022-10-25 13:42:46 | Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html | |
| 10 | 0000000000000000000000010_001 | Swissgrid AG | Inactive | 2020-12-21 00:00:00 | 2022-01-05 00:00:00 | 2021-12-23 09:12:31 | A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh. The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh. |