Zeige 1-20 von 74 Einträgen.
 IDNachrichten IDMarktteilnehmer NameEreignisstatusEreignistypEreignis StartEreignis StopTyp der NichtverfügbarkeitVeröffentlichungsdatum / -zeitMaßeinheitNicht verfügbare KapazitätVerfügbare KapazitätTechnische KapazitätBilanzierungszone 1Name der Anlage
 
 
 
×
×
 
×
 
 
890000000000000000000000089_001MET Speicher GmbHInactiveInjection unavailability2023-02-28 18:00:002023-03-15 18:00:00Planned2023-02-28 10:40:36GWh/d24.744000.0000024.7440037Y005053MH0000RUGS Reckrod
880000000000000000000000088_001MET Speicher GmbHInactiveWithdrawal unavailability2022-12-06 06:00:002022-12-08 16:00:00Planned2022-12-05 14:34:56GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
870000000000000000000000087_001MET Speicher GmbHInactiveWithdrawal unavailability2022-11-28 06:00:002022-11-30 06:00:00Planned2022-11-27 10:09:25GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
860000000000000000000000080_002MET Speicher GmbHInactiveStorage unavailability2023-04-04 16:00:002023-05-09 16:00:00Planned2022-11-16 16:42:06GWh15.000001427.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
850000000000000000000000079_002MET Speicher GmbHInactiveWithdrawal unavailability2023-04-04 16:00:002023-05-09 16:00:00Planned2022-11-16 16:41:38kWh/h70000.000001845000.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
840000000000000000000000078_002MET Speicher GmbHInactiveStorage unavailability2023-03-17 08:00:002023-04-04 16:00:00Planned2022-11-16 16:40:51GWh32.000001410.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
830000000000000000000000077_002MET Speicher GmbHInactiveWithdrawal unavailability2023-03-17 08:00:002023-04-04 16:00:00Planned2022-11-16 16:40:32kWh/h155500.000001759500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
820000000000000000000000076_002MET Speicher GmbHInactiveStorage unavailability2023-02-10 08:00:002023-03-17 08:00:00Planned2022-11-16 16:39:02GWh17.000001425.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
810000000000000000000000075_002MET Speicher GmbHInactiveWithdrawal unavailability2023-02-10 08:00:002023-03-17 08:00:00Planned2022-11-16 16:37:23kWh/h85500.000001829500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
800000000000000000000000080_001MET Speicher GmbHDismissedStorage unavailability2023-04-04 16:00:002023-05-24 16:00:00Planned2022-11-11 15:56:34GWh15.000001427.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
790000000000000000000000079_001MET Speicher GmbHDismissedWithdrawal unavailability2023-04-04 16:00:002023-05-24 16:00:00Planned2022-11-11 15:56:21kWh/h70000.000001845000.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
780000000000000000000000078_001MET Speicher GmbHDismissedStorage unavailability2023-03-15 08:00:002023-04-04 16:00:00Planned2022-11-11 15:56:03GWh32.000001410.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
770000000000000000000000077_001MET Speicher GmbHDismissedWithdrawal unavailability2023-03-15 08:00:002023-04-04 16:00:00Planned2022-11-11 15:55:50kWh/h155500.000001759500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
760000000000000000000000076_001MET Speicher GmbHDismissedStorage unavailability2023-02-10 08:00:002023-03-15 08:00:00Planned2022-11-11 15:55:29GWh17.000001425.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
750000000000000000000000075_001MET Speicher GmbHDismissedWithdrawal unavailability2023-02-10 08:00:002023-03-15 08:00:00Planned2022-11-11 15:55:15kWh/h85500.000001829500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
740000000000000000000000074_001MET Speicher GmbHInactiveTransmission system unavailability2023-09-20 08:00:002023-09-20 18:00:00Planned2022-11-11 14:59:13kWh/h418977.000000.00000418977.0000021YNL----TTF---1UGS Etzel-ESE MET
730000000000000000000000048_003MET Speicher GmbHInactiveStorage unavailability2022-10-18 06:00:002022-11-04 06:00:00Planned2022-11-03 18:13:45GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
720000000000000000000000048_002MET Speicher GmbHDismissedStorage unavailability2022-10-18 06:00:002022-11-11 16:00:00Planned2022-10-13 06:22:49GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
710000000000000000000000058_002MET Speicher GmbHInactiveInjection unavailability2022-10-10 08:00:002022-12-16 16:00:00Planned2022-09-23 09:17:44kWh/h752000.000001505000.000002257000.0000037Y005053MH0000RUGS Etzel-ESE MET
700000000000000000000000038_004MET Speicher GmbHInactiveStorage unavailability2022-10-09 06:00:002022-10-15 18:00:00Planned2022-09-23 09:11:28GWh1442.000000.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
Zeige 41-60 von 201 Einträgen.
 IDNachrichten IDMarktteilnehmer NameEreignisstatusEreignistypEreignis StartEreignis StopTyp der NichtverfügbarkeitVeröffentlichungsdatum / -zeitMaßeinheitNicht verfügbare KapazitätVerfügbare KapazitätInstallierte KapazitätKraftstofftypGebotszoneName der Anlage
 
 
 
×
×
 
×
 
 
 
2410000000000000000000000237_005Ineos oxide utilities NVDismissedProduction unavailability2024-06-26 18:15:002024-06-27 12:00:00Unplanned2024-06-27 12:59:54MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2400000000000000000000000237_004Ineos oxide utilities NVDismissedProduction unavailability2024-06-26 18:15:002024-06-27 12:00:00Unplanned2024-06-27 12:58:09MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2390000000000000000000000237_003Ineos oxide utilities NVDismissedProduction unavailability2024-06-26 18:15:002024-06-27 12:00:00Unplanned2024-06-27 09:48:28MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2380000000000000000000000237_002Ineos oxide utilities NVDismissedProduction unavailability2024-06-26 18:15:002024-06-27 12:00:00Unplanned2024-06-26 17:56:43MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2370000000000000000000000237_001Ineos oxide utilities NVDismissedProduction unavailability2024-06-26 18:15:002024-06-26 21:00:00Unplanned2024-06-26 17:13:06MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2360000000000000000000000236_001Ineos oxide utilities NVInactiveProduction unavailability2024-06-24 16:35:002024-06-25 10:00:00Unplanned2024-06-24 16:19:11MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2350000000000000000000000235_001Ineos oxide utilities NVInactiveProduction unavailability2024-06-19 09:25:002024-06-19 13:25:00Unplanned2024-06-19 07:49:47MW70.0000069.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2340000000000000000000000231_004Ineos oxide utilities NVInactiveProduction unavailability2024-06-07 21:30:002024-06-14 19:00:00Unplanned2024-06-14 17:43:23MW49.0000090.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2330000000000000000000000231_003Ineos oxide utilities NVDismissedProduction unavailability2024-06-07 21:30:002024-06-15 00:00:00Unplanned2024-06-10 08:14:16MW49.0000090.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2320000000000000000000000231_002Ineos oxide utilities NVDismissedProduction unavailability2024-06-07 21:30:002024-06-11 00:00:00Unplanned2024-06-08 13:46:09MW49.0000090.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2310000000000000000000000231_001Ineos oxide utilities NVDismissedProduction unavailability2024-06-07 21:30:002024-06-11 00:00:00Unplanned2024-06-07 19:45:31MW39.00000100.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2300000000000000000000000229_002Ineos oxide utilities NVInactiveProduction unavailability2024-06-03 20:00:002024-06-07 15:00:00Unplanned2024-06-07 11:35:34MW74.0000065.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2290000000000000000000000229_001Ineos oxide utilities NVDismissedProduction unavailability2024-06-03 20:00:002024-06-08 00:00:00Unplanned2024-06-03 14:04:55MW74.0000065.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2280000000000000000000000226_003Ineos oxide utilities NVInactiveProduction unavailability2024-05-20 20:00:002024-05-23 18:00:00Planned2024-05-23 16:02:01MW76.0000065.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2270000000000000000000000226_002Ineos oxide utilities NVDismissedProduction unavailability2024-05-20 20:00:002024-05-25 00:00:00Planned2024-05-17 10:26:09MW76.0000065.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2260000000000000000000000226_001Ineos oxide utilities NVDismissedProduction unavailability2024-05-20 00:00:002024-05-25 00:00:00Planned2024-05-13 08:23:54MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2250000000000000000000000224_002Ineos oxide utilities NVInactiveProduction unavailability2024-04-03 12:30:002024-04-03 15:00:00Unplanned2024-04-03 13:27:12MW50.0000089.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2240000000000000000000000224_001Ineos oxide utilities NVDismissedProduction unavailability2024-04-03 12:30:002024-04-03 16:30:00Unplanned2024-04-03 11:25:02MW50.0000089.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2230000000000000000000000222_002Ineos oxide utilities NVInactiveProduction unavailability2024-02-08 20:15:002024-02-09 14:30:00Unplanned2024-02-09 13:32:23MW25.00000114.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2220000000000000000000000222_001Ineos oxide utilities NVDismissedProduction unavailability2024-02-08 20:15:002024-02-10 00:00:00Unplanned2024-02-08 19:18:16MW25.00000114.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
Zeige 1-5 von 5 Einträgen.
 IDNachrichten IDMarktteilnehmer NameEreignisstatusEreignis StartEreignis StopVeröffentlichungsdatum / -zeitBemerkungen
 
 
×
×
×
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.

The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh.