Showing 61-75 of 75 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityTechnical CapacityBalancing Zone 1Affected Asset Name
 
 
 
×
×
 
×
 
 
300000000000000000000000030_001astora GmbH and Co. KGInactiveInjection unavailability2021-06-07 07:00:002021-06-09 16:00:00Planned2021-06-04 12:48:20kWh/h4132332.000000.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
290000000000000000000000027_003astora GmbH and Co. KGInactiveWithdrawal unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-06-04 12:43:09kWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
280000000000000000000000027_002astora GmbH and Co. KGDismissedWithdrawal unavailability2021-10-04 07:00:002021-10-19 16:05:00Planned2021-06-01 06:06:56KWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
270000000000000000000000027_001astora GmbH and Co. KGDismissedWithdrawal unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-05-30 15:20:09KWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
260000000000000000000000025_002astora GmbH and Co. KGInactiveInjection unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-05-30 15:14:10KWh/h4132332.000000.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
250000000000000000000000025_001astora GmbH and Co. KGDismissedOffshore pipeline unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-05-29 06:17:08KWh/h4132332.000000.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
240000000000000000000000022_002astora GmbH and Co. KGInactiveInjection unavailability2021-10-26 16:00:002021-11-17 22:00:00Planned2021-05-28 08:18:49KWh/h1033083.000003099249.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
230000000000000000000000023_001astora GmbH and Co. KGInactiveInjection unavailability2021-10-19 16:00:002021-10-26 16:00:00Planned2021-05-28 08:11:06KWh/h2066166.000002066166.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
220000000000000000000000022_001astora GmbH and Co. KGDismissedInjection unavailability2021-10-26 16:00:002021-11-17 22:00:00Planned2021-05-28 08:06:38KWh/h3099249.000001033083.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
210000000000000000000000021_001astora GmbH and Co. KGInactiveWithdrawal unavailability2021-10-04 06:00:002021-10-15 18:00:00Planned2021-05-26 19:21:51KWh/h22100000.000000.0000022100000.0000037Z0000000052293Rehden natural gas storage facility
200000000000000000000000020_001astora GmbH and Co. KGInactiveInjection unavailability2021-10-04 06:00:002021-10-15 18:00:00Planned2021-05-25 12:09:00KWh/h14365000.000000.0000014365000.0000037Z0000000052293Rehden natural gas storage facility
190000000000000000000000018_002astora GmbH and Co. KGDismissedWithdrawal unavailability2020-10-05 06:00:002020-10-17 18:00:00Planned2020-06-10 09:57:00KWh/h22100000.000000.0000022100000.0000037Z0000000052293Rehden natural gas storage facility
180000000000000000000000018_001astora GmbH and Co. KGDismissedWithdrawal unavailability2020-10-05 06:00:002020-10-17 18:00:00Planned2020-06-10 09:51:11KWh/h22100000.000000.0000022100000.0000037Z0000000052293Rehden natural gas storage facility
170000000000000000000000016_002astora GmbH and Co. KGInactiveInjection unavailability2020-11-02 08:00:002020-12-11 18:00:00Planned2020-06-10 09:41:22KWh/h14365000.000000.0000014365000.0000037Z0000000052293Rehden natural gas storage facility
160000000000000000000000016_001astora GmbH and Co. KGDismissedInjection unavailability2020-10-05 06:00:002020-10-17 18:00:00Planned2020-06-10 09:31:00KWh/h14365000.000000.0000014365000.0000037Z0000000052293Rehden natural gas storage facility
Showing 1-20 of 332 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityInstalled CapacityFuel TypeBidding ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
4750000000000000000000000473_002EKO ENERGY CYPRUS LTDInactiveProduction unavailability2026-06-11 09:30:002026-06-11 15:30:00Planned2026-06-10 09:26:40MW5.0000038.5600041.00000Solar10YCY-1001A0003JEKO ENERGY CY
4730000000000000000000000473_001EKO ENERGY CYPRUS LTDActiveProduction unavailability2026-06-11 09:30:002026-06-11 15:30:00Planned2026-06-10 09:26:40MW5.0000038.5600041.00000Solar10YCY-1001A0003JEKO ENERGY CY
4710000000000000000000000466_002Knockacummer Wind Farm LimitedInactiveProduction unavailability2026-05-18 07:00:002026-06-05 17:00:00Planned2026-05-28 09:23:57MW100.000000.00000100.00000Wind Onshore10Y1001A1001A59CKnockacummer Wind Farm Limited
4700000000000000000000000468_003Ineos oxide utilities NVInactiveProduction unavailability2026-06-05 11:00:002026-06-05 12:00:00Unplanned2026-06-05 10:40:32MW0.00000139.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
4690000000000000000000000468_002Ineos oxide utilities NVActiveProduction unavailability2026-06-05 11:00:002026-06-05 12:00:00Unplanned2026-06-05 10:40:32MW0.00000139.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
4680000000000000000000000468_001Ineos oxide utilities NVActiveProduction unavailability2026-06-05 11:00:002026-06-05 14:00:00Unplanned2026-06-05 09:08:40MW0.00000139.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
4660000000000000000000000466_001Knockacummer Wind Farm LimitedActiveProduction unavailability2026-05-18 07:00:002026-06-05 17:00:00Planned2026-05-28 09:23:57MW100.000000.00000100.00000Wind Onshore10Y1001A1001A59CKnockacummer Wind Farm Limited
4650000000000000000000000465_001SYNENERGIA LTDInactiveProduction unavailability2026-05-27 08:00:002026-05-27 13:00:00Planned2026-05-25 09:15:51MW2.5000023.9140026.41400Solar10YCY-1001A0003JSYNENERGIA_RES-A
4630000000000000000000000463_001E.FOS LTDInactiveProduction unavailability2026-05-18 09:00:002026-05-26 09:00:00Planned2026-05-22 07:02:10MW3.500001.500005.00000Solar10YCY-1001A0003JIliomorfon1
4610000000000000000000000459_003E.FOS LTDInactiveProduction unavailability2026-05-18 09:00:002026-05-26 09:00:00Planned2026-05-22 06:55:15MW3.500001.500005.00000Solar10YCY-1001A0003JArmolia LTD
4600000000000000000000000459_002E.FOS LTDDismissedProduction unavailability2026-05-18 09:00:002026-05-26 09:00:00Planned2026-05-22 06:54:34MW3500.000001500.000005.00000Solar10YCY-1001A0003JArmolia LTD
4590000000000000000000000459_001E.FOS LTDDismissedProduction unavailability2026-05-18 09:00:002026-05-26 09:00:00Planned2026-05-22 06:53:40MW3500.000001500.000005.00000Solar10YCY-1001A0003JArmolia LTD
4570000000000000000000000457_001Ineos oxide utilities NVInactiveProduction unavailability2026-05-18 06:00:002026-05-18 09:00:00Unplanned2026-05-18 05:12:22MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
4560000000000000000000000456_001Ineos oxide utilities NVInactiveProduction unavailability2026-05-18 06:00:002026-05-08 09:00:00Unplanned2026-05-18 04:22:23MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
4550000000000000000000000449_003E.FOS LTDInactiveProduction unavailability2026-05-13 14:15:002026-05-15 15:15:00Planned2026-05-13 11:33:58MW2.000000.000005.00000Solar10YCY-1001A0003JIliomorfon1
4530000000000000000000000449_002E.FOS LTDDismissedProduction unavailability2026-05-13 14:15:002026-05-15 15:15:00Planned2026-05-13 11:33:38MW200000.000000.000005.00000Solar10YCY-1001A0003JIliomorfon1
4510000000000000000000000451_001E.FOS LTDInactiveProduction unavailability2026-05-13 14:00:002026-05-15 15:00:00Planned2026-05-13 11:26:31MW1.000000.000001.00000Solar10YCY-1001A0003JIliomorfon 3
4490000000000000000000000449_001E.FOS LTDDismissedProduction unavailability2026-05-13 14:15:002026-05-15 15:15:00Planned2026-05-13 11:24:21MW500000.000000.000005.00000Solar10YCY-1001A0003JIliomorfon1
4480000000000000000000000446_002Ineos oxide utilities NVInactiveProduction unavailability2026-05-10 21:00:002026-05-19 00:00:00Unplanned2026-05-13 07:20:40MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
4460000000000000000000000446_001Ineos oxide utilities NVDismissedProduction unavailability2026-05-10 21:00:002026-05-13 16:00:00Unplanned2026-05-10 17:26:44MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
Showing 1-8 of 8 items.
 IDMessage IDMarket Participant NameEvent StatusEvent StartEvent StopPublication date/timeRemarks
 
 
×
×
×
180000000000000000000000018_001MET International AGActive2025-07-17 00:00:00(not set)2025-07-29 15:55:33MET International AG's regasification capacity is available due to termination of the TUA by MET International AG pursuant to its terms.
160000000000000000000000016_001Swissgrid AGInactive2026-02-01 00:00:002026-05-15 23:55:002025-06-20 12:30:16Information about the Swiss hydropower reserve administrated by Swissgrid on behalf of the Swiss national regulator ElCom according to the Swiss Ordinance on the establishment of a hydropower reserve is available on the website of ElCom. Today ElCom fixed a total energy volume of 250 GWh for the coming winter period (01 February 2026 until 15 May 2026). See https://www.elcom.admin.ch/elcom/de/home/dokumentation/weisungen.html
150000000000000000000000015_001Swissgrid AGInactive2025-02-18 08:00:002025-02-18 10:00:002025-02-14 13:53:46Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with a thermal reserve power plant between 18/02/2025 08:00 and 18/02/2025 10:00. During this period, an excess of approx. 500 MWh will be fed into the grid, which may have an impact on prices.
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.

The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh.