ID | Message ID | Market Participant Name | Event Status | Type of Event | Event Start | Event Stop | Type of Unavailability | Publication date/time | Unit of Measurement | Unavailable Capacity | Available Capacity | Technical Capacity | Balancing Zone 1 | Affected Asset Name | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| |||||||||||||
89 | 0000000000000000000000089_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2023-02-28 18:00:00 | 2023-03-15 18:00:00 | Planned | 2023-02-28 10:40:36 | GWh/d | 24.74400 | 0.00000 | 24.74400 | 37Y005053MH0000R | UGS Reckrod | |
88 | 0000000000000000000000088_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-12-06 06:00:00 | 2022-12-08 16:00:00 | Planned | 2022-12-05 14:34:56 | GWh/d | 49.50000 | 0.00000 | 49.50000 | 37Y005053MH0000R | UGS Reckrod | |
87 | 0000000000000000000000087_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-11-28 06:00:00 | 2022-11-30 06:00:00 | Planned | 2022-11-27 10:09:25 | GWh/d | 49.50000 | 0.00000 | 49.50000 | 37Y005053MH0000R | UGS Reckrod | |
86 | 0000000000000000000000080_002 | MET Speicher GmbH | Inactive | Storage unavailability | 2023-04-04 16:00:00 | 2023-05-09 16:00:00 | Planned | 2022-11-16 16:42:06 | GWh | 15.00000 | 1427.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
85 | 0000000000000000000000079_002 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2023-04-04 16:00:00 | 2023-05-09 16:00:00 | Planned | 2022-11-16 16:41:38 | kWh/h | 70000.00000 | 1845000.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
84 | 0000000000000000000000078_002 | MET Speicher GmbH | Inactive | Storage unavailability | 2023-03-17 08:00:00 | 2023-04-04 16:00:00 | Planned | 2022-11-16 16:40:51 | GWh | 32.00000 | 1410.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
83 | 0000000000000000000000077_002 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2023-03-17 08:00:00 | 2023-04-04 16:00:00 | Planned | 2022-11-16 16:40:32 | kWh/h | 155500.00000 | 1759500.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
82 | 0000000000000000000000076_002 | MET Speicher GmbH | Inactive | Storage unavailability | 2023-02-10 08:00:00 | 2023-03-17 08:00:00 | Planned | 2022-11-16 16:39:02 | GWh | 17.00000 | 1425.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
81 | 0000000000000000000000075_002 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2023-02-10 08:00:00 | 2023-03-17 08:00:00 | Planned | 2022-11-16 16:37:23 | kWh/h | 85500.00000 | 1829500.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
80 | 0000000000000000000000080_001 | MET Speicher GmbH | Dismissed | Storage unavailability | 2023-04-04 16:00:00 | 2023-05-24 16:00:00 | Planned | 2022-11-11 15:56:34 | GWh | 15.00000 | 1427.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
79 | 0000000000000000000000079_001 | MET Speicher GmbH | Dismissed | Withdrawal unavailability | 2023-04-04 16:00:00 | 2023-05-24 16:00:00 | Planned | 2022-11-11 15:56:21 | kWh/h | 70000.00000 | 1845000.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
78 | 0000000000000000000000078_001 | MET Speicher GmbH | Dismissed | Storage unavailability | 2023-03-15 08:00:00 | 2023-04-04 16:00:00 | Planned | 2022-11-11 15:56:03 | GWh | 32.00000 | 1410.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
77 | 0000000000000000000000077_001 | MET Speicher GmbH | Dismissed | Withdrawal unavailability | 2023-03-15 08:00:00 | 2023-04-04 16:00:00 | Planned | 2022-11-11 15:55:50 | kWh/h | 155500.00000 | 1759500.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
76 | 0000000000000000000000076_001 | MET Speicher GmbH | Dismissed | Storage unavailability | 2023-02-10 08:00:00 | 2023-03-15 08:00:00 | Planned | 2022-11-11 15:55:29 | GWh | 17.00000 | 1425.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
75 | 0000000000000000000000075_001 | MET Speicher GmbH | Dismissed | Withdrawal unavailability | 2023-02-10 08:00:00 | 2023-03-15 08:00:00 | Planned | 2022-11-11 15:55:15 | kWh/h | 85500.00000 | 1829500.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
74 | 0000000000000000000000074_001 | MET Speicher GmbH | Inactive | Transmission system unavailability | 2023-09-20 08:00:00 | 2023-09-20 18:00:00 | Planned | 2022-11-11 14:59:13 | kWh/h | 418977.00000 | 0.00000 | 418977.00000 | 21YNL----TTF---1 | UGS Etzel-ESE MET | |
73 | 0000000000000000000000048_003 | MET Speicher GmbH | Inactive | Storage unavailability | 2022-10-18 06:00:00 | 2022-11-04 06:00:00 | Planned | 2022-11-03 18:13:45 | GWh | 1461.00000 | 0.00000 | 1461.00000 | 37Y005053MH0000R | UGS Reckrod | |
72 | 0000000000000000000000048_002 | MET Speicher GmbH | Dismissed | Storage unavailability | 2022-10-18 06:00:00 | 2022-11-11 16:00:00 | Planned | 2022-10-13 06:22:49 | GWh | 1461.00000 | 0.00000 | 1461.00000 | 37Y005053MH0000R | UGS Reckrod | |
71 | 0000000000000000000000058_002 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-10-10 08:00:00 | 2022-12-16 16:00:00 | Planned | 2022-09-23 09:17:44 | kWh/h | 752000.00000 | 1505000.00000 | 2257000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
70 | 0000000000000000000000038_004 | MET Speicher GmbH | Inactive | Storage unavailability | 2022-10-09 06:00:00 | 2022-10-15 18:00:00 | Planned | 2022-09-23 09:11:28 | GWh | 1442.00000 | 0.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET |
ID | Message ID | Market Participant Name | Event Status | Type of Event | Event Start | Event Stop | Type of Unavailability | Publication date/time | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Fuel Type | Bidding Zone | Affected Asset Name | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| ||||||||||||||
201 | 0000000000000000000000199_003 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-12-23 10:00:00 | 2024-01-03 00:00:00 | Unplanned | 2023-12-26 11:25:37 | MW | 30.00000 | 109.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
200 | 0000000000000000000000199_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-12-23 10:00:00 | 2023-12-28 00:00:00 | Unplanned | 2023-12-26 09:06:02 | MW | 30.00000 | 109.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
199 | 0000000000000000000000199_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-12-23 10:00:00 | 2023-12-27 00:00:00 | Unplanned | 2023-12-23 08:52:04 | MW | 30.00000 | 109.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
198 | 0000000000000000000000196_002 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-12-09 00:00:00 | 2023-12-22 15:00:00 | Planned | 2023-12-22 18:17:40 | MW | 46.00000 | 93.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
197 | 0000000000000000000000197_001 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-12-14 08:00:00 | 2023-12-15 00:00:00 | Unplanned | 2023-12-14 07:53:19 | MW | 95.00000 | 44.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
196 | 0000000000000000000000196_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-12-09 00:00:00 | 2024-01-01 00:00:00 | Planned | 2023-12-09 09:47:45 | MW | 46.00000 | 93.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
195 | 0000000000000000000000164_006 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-11-15 00:00:00 | 2023-12-09 00:00:00 | Planned | 2023-12-09 09:47:31 | MW | 98.00000 | 41.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
194 | 0000000000000000000000164_005 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-11-15 00:00:00 | 2024-01-01 00:00:00 | Planned | 2023-12-07 12:45:25 | MW | 98.00000 | 41.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
193 | 0000000000000000000000193_001 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-12-07 15:00:00 | 2023-12-09 00:00:00 | Planned | 2023-12-07 10:02:15 | MW | 92.50000 | 46.50000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
192 | 0000000000000000000000192_001 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-12-04 16:00:00 | 2023-12-05 17:00:00 | Unplanned | 2023-12-04 15:37:15 | MW | 92.50000 | 46.50000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
191 | 0000000000000000000000191_001 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-11-23 10:00:00 | 2023-11-25 00:00:00 | Planned | 2023-11-22 08:53:37 | MW | 139.00000 | 0.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
190 | 0000000000000000000000187_002 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-11-23 14:00:00 | 2023-11-29 00:00:00 | Planned | 2023-11-20 09:07:16 | MW | 93.00000 | 46.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
189 | 0000000000000000000000186_002 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-11-22 18:00:00 | 2023-11-23 14:00:00 | Planned | 2023-11-20 09:04:52 | MW | 101.00000 | 38.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
188 | 0000000000000000000000180_006 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-11-11 16:00:00 | 2023-11-22 18:00:00 | Unplanned | 2023-11-20 09:03:56 | MW | 117.00000 | 22.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
187 | 0000000000000000000000187_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-11-22 14:00:00 | 2023-11-29 00:00:00 | Planned | 2023-11-17 12:32:09 | MW | 93.00000 | 46.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
186 | 0000000000000000000000186_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-11-21 14:00:00 | 2023-11-22 14:00:00 | Planned | 2023-11-17 12:29:05 | MW | 101.00000 | 38.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
185 | 0000000000000000000000180_005 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-11-11 16:00:00 | 2023-11-21 14:00:00 | Unplanned | 2023-11-17 12:26:36 | MW | 117.00000 | 22.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
184 | 0000000000000000000000164_004 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-11-15 00:00:00 | 2023-12-11 00:00:00 | Planned | 2023-11-17 12:24:05 | MW | 98.00000 | 41.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
183 | 0000000000000000000000180_004 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-11-11 16:00:00 | 2023-11-22 00:00:00 | Unplanned | 2023-11-16 12:19:25 | MW | 117.00000 | 22.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
182 | 0000000000000000000000180_003 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-11-11 16:00:00 | 2023-11-18 00:00:00 | Unplanned | 2023-11-15 09:51:17 | MW | 117.00000 | 22.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK |
ID | Message ID | Market Participant Name | Event Status | Event Start | Event Stop | Publication date/time | Remarks | |
---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| ||||||
14 | 0000000000000000000000012_002 | Swissgrid AG | Dismissed | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-14 17:40:34 | Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices. | |
13 | 0000000000000000000000013_001 | Swissgrid AG | Inactive | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-14 17:27:59 | UPDATE (reduced amount of energy) Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices. | |
12 | 0000000000000000000000012_001 | Swissgrid AG | Dismissed | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-13 15:04:43 | Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices. | |
11 | 0000000000000000000000011_001 | Swissgrid AG | Inactive | 2022-12-01 00:00:00 | 2023-05-15 23:55:00 | 2022-10-25 13:42:46 | Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html | |
10 | 0000000000000000000000010_001 | Swissgrid AG | Inactive | 2020-12-21 00:00:00 | 2022-01-05 00:00:00 | 2021-12-23 09:12:31 | A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh. The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh. |