Showing 1-20 of 74 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityTechnical CapacityBalancing Zone 1Affected Asset Name
 
 
 
×
×
 
×
 
 
890000000000000000000000089_001MET Speicher GmbHInactiveInjection unavailability2023-02-28 18:00:002023-03-15 18:00:00Planned2023-02-28 10:40:36GWh/d24.744000.0000024.7440037Y005053MH0000RUGS Reckrod
880000000000000000000000088_001MET Speicher GmbHInactiveWithdrawal unavailability2022-12-06 06:00:002022-12-08 16:00:00Planned2022-12-05 14:34:56GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
870000000000000000000000087_001MET Speicher GmbHInactiveWithdrawal unavailability2022-11-28 06:00:002022-11-30 06:00:00Planned2022-11-27 10:09:25GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
860000000000000000000000080_002MET Speicher GmbHInactiveStorage unavailability2023-04-04 16:00:002023-05-09 16:00:00Planned2022-11-16 16:42:06GWh15.000001427.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
850000000000000000000000079_002MET Speicher GmbHInactiveWithdrawal unavailability2023-04-04 16:00:002023-05-09 16:00:00Planned2022-11-16 16:41:38kWh/h70000.000001845000.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
840000000000000000000000078_002MET Speicher GmbHInactiveStorage unavailability2023-03-17 08:00:002023-04-04 16:00:00Planned2022-11-16 16:40:51GWh32.000001410.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
830000000000000000000000077_002MET Speicher GmbHInactiveWithdrawal unavailability2023-03-17 08:00:002023-04-04 16:00:00Planned2022-11-16 16:40:32kWh/h155500.000001759500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
820000000000000000000000076_002MET Speicher GmbHInactiveStorage unavailability2023-02-10 08:00:002023-03-17 08:00:00Planned2022-11-16 16:39:02GWh17.000001425.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
810000000000000000000000075_002MET Speicher GmbHInactiveWithdrawal unavailability2023-02-10 08:00:002023-03-17 08:00:00Planned2022-11-16 16:37:23kWh/h85500.000001829500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
800000000000000000000000080_001MET Speicher GmbHDismissedStorage unavailability2023-04-04 16:00:002023-05-24 16:00:00Planned2022-11-11 15:56:34GWh15.000001427.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
790000000000000000000000079_001MET Speicher GmbHDismissedWithdrawal unavailability2023-04-04 16:00:002023-05-24 16:00:00Planned2022-11-11 15:56:21kWh/h70000.000001845000.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
780000000000000000000000078_001MET Speicher GmbHDismissedStorage unavailability2023-03-15 08:00:002023-04-04 16:00:00Planned2022-11-11 15:56:03GWh32.000001410.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
770000000000000000000000077_001MET Speicher GmbHDismissedWithdrawal unavailability2023-03-15 08:00:002023-04-04 16:00:00Planned2022-11-11 15:55:50kWh/h155500.000001759500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
760000000000000000000000076_001MET Speicher GmbHDismissedStorage unavailability2023-02-10 08:00:002023-03-15 08:00:00Planned2022-11-11 15:55:29GWh17.000001425.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
750000000000000000000000075_001MET Speicher GmbHDismissedWithdrawal unavailability2023-02-10 08:00:002023-03-15 08:00:00Planned2022-11-11 15:55:15kWh/h85500.000001829500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
740000000000000000000000074_001MET Speicher GmbHInactiveTransmission system unavailability2023-09-20 08:00:002023-09-20 18:00:00Planned2022-11-11 14:59:13kWh/h418977.000000.00000418977.0000021YNL----TTF---1UGS Etzel-ESE MET
730000000000000000000000048_003MET Speicher GmbHInactiveStorage unavailability2022-10-18 06:00:002022-11-04 06:00:00Planned2022-11-03 18:13:45GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
720000000000000000000000048_002MET Speicher GmbHDismissedStorage unavailability2022-10-18 06:00:002022-11-11 16:00:00Planned2022-10-13 06:22:49GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
710000000000000000000000058_002MET Speicher GmbHInactiveInjection unavailability2022-10-10 08:00:002022-12-16 16:00:00Planned2022-09-23 09:17:44kWh/h752000.000001505000.000002257000.0000037Y005053MH0000RUGS Etzel-ESE MET
700000000000000000000000038_004MET Speicher GmbHInactiveStorage unavailability2022-10-09 06:00:002022-10-15 18:00:00Planned2022-09-23 09:11:28GWh1442.000000.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
Showing 1-20 of 279 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityInstalled CapacityFuel TypeBidding ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
3930000000000000000000000391_002Ineos oxide utilities NVActiveProduction unavailability2025-10-02 14:00:002025-10-15 00:00:00Unplanned2025-10-06 08:31:19MW92.5000046.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3910000000000000000000000391_001Ineos oxide utilities NVDismissedProduction unavailability2025-10-02 14:00:002025-10-11 00:00:00Unplanned2025-10-02 11:49:45MW92.5000046.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3900000000000000000000000390_001Ineos oxide utilities NVInactiveProduction unavailability2025-10-01 10:00:002025-10-04 00:00:00Unplanned2025-10-01 08:05:31MW50.0000089.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3890000000000000000000000389_001Ineos oxide utilities NVInactiveProduction unavailability2025-09-28 20:30:002025-09-29 16:00:00Unplanned2025-09-28 18:24:23MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3880000000000000000000000386_002Ineos oxide utilities NVDismissedProduction unavailability2025-09-27 10:00:002025-09-30 00:00:00Unplanned2025-09-28 18:20:47MW104.0000035.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3860000000000000000000000386_001Ineos oxide utilities NVDismissedProduction unavailability2025-09-27 10:00:002025-09-30 00:00:00Unplanned2025-09-27 08:58:57MW104.0000035.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3850000000000000000000000385_001Ineos oxide utilities NVInactiveProduction unavailability2025-09-25 19:10:002025-09-26 12:00:00Unplanned2025-09-25 17:11:04MW94.0000045.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3830000000000000000000000383_001Ineos oxide utilities NVInactiveProduction unavailability2025-09-24 18:45:002025-09-29 00:00:00Unplanned2025-09-25 08:16:45MW92.5000046.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3810000000000000000000000375_003Ineos oxide utilities NVDismissedProduction unavailability2025-09-24 18:45:002025-09-25 12:00:00Unplanned2025-09-24 17:41:08MW92.0000047.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3790000000000000000000000375_002Ineos oxide utilities NVActiveProduction unavailability2025-09-24 18:45:002025-09-25 12:00:00Unplanned2025-09-24 17:36:53MW92.0000047.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3770000000000000000000000375_002Ineos oxide utilities NVDismissedProduction unavailability2025-09-24 18:45:002025-09-25 12:00:00Unplanned2025-09-24 17:36:49MW92.0000047.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3750000000000000000000000375_001Ineos oxide utilities NVDismissedProduction unavailability2025-09-24 18:45:002025-09-24 21:45:00Unplanned2025-09-24 17:10:06MW92.0000047.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3740000000000000000000000374_001Ineos oxide utilities NVInactiveProduction unavailability2025-09-23 18:30:002025-09-24 12:00:00Unplanned2025-09-23 17:06:31MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3730000000000000000000000372_002Ineos oxide utilities NVInactiveProduction unavailability2025-09-08 00:00:002025-09-24 00:00:00Planned2025-09-19 11:55:43MW92.5000046.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3720000000000000000000000372_001Ineos oxide utilities NVDismissedProduction unavailability2025-09-08 00:00:002025-09-19 00:00:00Planned2025-08-12 12:32:21MW71.5000067.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3710000000000000000000000371_001Ineos oxide utilities NVInactiveProduction unavailability2025-08-15 00:00:002025-09-08 00:00:00Planned2025-08-12 12:30:30MW92.5000046.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3700000000000000000000000370_001Ineos oxide utilities NVInactiveProduction unavailability2025-08-14 10:00:002025-08-15 00:00:00Planned2025-08-12 12:28:51MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3680000000000000000000000356_008Ineos oxide utilities NVInactiveProduction unavailability2025-07-02 18:00:002025-07-03 15:50:00Unplanned2025-07-03 13:45:34MW74.5000064.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3670000000000000000000000356_007Ineos oxide utilities NVDismissedProduction unavailability2025-07-02 18:00:002025-07-03 16:00:00Unplanned2025-07-03 09:15:27MW74.5000064.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
3660000000000000000000000356_006Ineos oxide utilities NVDismissedProduction unavailability2025-07-02 18:00:002025-07-03 12:00:00Unplanned2025-07-03 09:14:57MW74.5000064.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
Showing 1-8 of 8 items.
 IDMessage IDMarket Participant NameEvent StatusEvent StartEvent StopPublication date/timeRemarks
 
 
×
×
×
180000000000000000000000018_001MET International AGActive2025-07-17 00:00:00(not set)2025-07-29 15:55:33MET International AG's regasification capacity is available due to termination of the TUA by MET International AG pursuant to its terms.
160000000000000000000000016_001Swissgrid AGActive2026-02-01 00:00:002026-05-15 23:55:002025-06-20 12:30:16Information about the Swiss hydropower reserve administrated by Swissgrid on behalf of the Swiss national regulator ElCom according to the Swiss Ordinance on the establishment of a hydropower reserve is available on the website of ElCom. Today ElCom fixed a total energy volume of 250 GWh for the coming winter period (01 February 2026 until 15 May 2026). See https://www.elcom.admin.ch/elcom/de/home/dokumentation/weisungen.html
150000000000000000000000015_001Swissgrid AGInactive2025-02-18 08:00:002025-02-18 10:00:002025-02-14 13:53:46Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with a thermal reserve power plant between 18/02/2025 08:00 and 18/02/2025 10:00. During this period, an excess of approx. 500 MWh will be fed into the grid, which may have an impact on prices.
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.

The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh.