Showing 41-60 of 75 items.
 IDMessage IDMp NameEvent StatusType of EventEvent Start (UTC)Event Stop (UTC)Type of UnavailabilityPublication date/time (UTC)Unit of MeasurementUnavailable CapacityAvailable CapacityTechnical CapacityBalancing ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
500000000000000000000000036_002MET Speicher GmbHInactiveWithdrawal unavailability2022-03-17 18:00:002022-05-20 16:00:00Planned2022-04-28 13:07:34kWh/h95750.000001819250.000001915000.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
490000000000000000000000035_002MET Speicher GmbHInactiveStorage unavailability2022-03-17 18:00:002022-05-20 16:00:00Planned2022-04-28 13:06:39GWh11.756001473.244001485.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
480000000000000000000000048_001MET Speicher GmbHDismissedStorage unavailability2022-10-17 06:00:002022-11-11 16:00:00Planned2022-04-25 15:23:18GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
470000000000000000000000047_001MET Speicher GmbHInactiveWithdrawal unavailability2022-07-25 06:00:002022-07-29 16:00:00Planned2022-04-25 15:22:28kWh/h1031500.000001031500.000002063000.0000037Y005053MH0000RUGS Reckrod
460000000000000000000000046_001MET Speicher GmbHInactiveInjection unavailability2022-07-25 06:00:002022-07-29 16:00:00Planned2022-04-25 15:21:37kWh/h515500.00000515500.000001031000.0000037Y005053MH0000RUGS Reckrod
450000000000000000000000045_001MET Speicher GmbHInactiveWithdrawal unavailability2022-07-18 06:00:002022-07-22 16:00:00Planned2022-04-25 15:20:44kWh/h1031500.000001031500.000002063000.0000037Y005053MH0000RUGS Reckrod
440000000000000000000000044_001MET Speicher GmbHInactiveInjection unavailability2022-07-18 06:00:002022-07-22 16:00:00Planned2022-04-25 15:19:50kWh/h515500.00000515500.000001031000.0000037Y005053MH0000RUGS Reckrod
430000000000000000000000043_001MET Speicher GmbHInactiveInjection unavailability2022-07-11 06:00:002022-07-15 16:00:00Planned2022-04-25 15:18:56kWh/h1031000.000000.000001031000.0000037Y005053MH0000RUGS Reckrod
420000000000000000000000042_001MET Speicher GmbHInactiveInjection unavailability2022-03-23 06:00:002022-03-24 18:00:00Planned2022-03-17 08:23:50kWh/h957000.00000170000.000001127000.0000037Y005053MH0000RUGS Reckrod
410000000000000000000000041_001MET Speicher GmbHInactiveWithdrawal unavailability2022-03-23 06:00:002022-03-24 18:00:00Planned2022-03-17 08:23:25kWh/h2063000.000000.000002063000.0000037Y005053MH0000RUGS Reckrod
400000000000000000000000040_001MET Speicher GmbHInactiveWithdrawal unavailability2022-05-26 06:00:002022-07-22 18:00:00Planned2022-03-17 08:54:49GWh24.970001417.030001442.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
390000000000000000000000039_001MET Speicher GmbHInactiveInjection unavailability2022-05-26 06:00:002022-07-22 18:00:00Planned2022-03-17 08:54:32GWh68.440001373.560001442.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
380000000000000000000000038_001MET Speicher GmbHDismissedStorage unavailability2022-10-09 06:00:002022-10-15 18:00:00Planned2022-01-03 16:53:35GWh1485.000000.000001485.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
370000000000000000000000037_001MET Speicher GmbHInactiveOther unavailability2022-09-21 08:00:002022-09-21 18:00:00Planned2022-01-03 16:53:25kWh/h419000.000000.00000419000.0000021YNL----TTF---1UGS Etzel-ESE MET
360000000000000000000000036_001MET Speicher GmbHDismissedWithdrawal unavailability2022-03-17 18:00:002022-05-13 16:00:00Planned2022-01-03 16:53:15kWh/h95750.000001819250.000001915000.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
350000000000000000000000035_001MET Speicher GmbHDismissedStorage unavailability2022-03-17 18:00:002022-05-13 16:00:00Planned2022-01-03 16:53:00GWh11.756001473.244001485.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
340000000000000000000000034_001MET Speicher GmbHInactiveWithdrawal unavailability2022-01-17 08:00:002022-03-25 16:00:00Planned2022-01-03 16:52:47kWh/h631950.000001283050.000001915000.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
330000000000000000000000033_001MET Speicher GmbHInactiveInjection unavailability2022-01-17 08:00:002022-03-25 16:00:00Planned2022-01-03 16:52:30kWh/h750750.000001524250.000002275000.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
320000000000000000000000032_001MET Speicher GmbHInactiveInjection unavailability2022-01-03 08:00:002022-01-16 16:00:00Planned2022-01-03 16:51:54kWh/h750750.000001524250.000002275000.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
310000000000000000000000031_001astora GmbH and Co. KGInactiveWithdrawal unavailability2021-06-07 07:00:002021-06-09 16:00:00Planned2021-06-07 22:59:18kWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
Showing 161-180 of 343 items.
 IDMessage IDMp NameEvent StatusType of EventEvent Start (UTC)Event Stop (UTC)Type of UnavailabilityPublication date/time (UTC)Unit of MeasurementInstalled CapacityFuel TypeBidding ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
 
2630000000000000000000000263_001Ineos oxide utilities NVDismissedProduction unavailability2024-10-18 21:20:002024-10-22 23:55:00Unplanned2024-10-18 19:23:35MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2620000000000000000000000262_001Ineos oxide utilities NVDismissedProduction unavailability2024-10-18 21:20:002024-10-22 23:55:00Unplanned2024-10-18 19:23:34MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2610000000000000000000000261_001Energie Wasser BernActiveProduction unavailability2027-08-01 07:00:002027-09-30 17:00:00Planned2024-10-15 10:59:28MW43.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
2600000000000000000000000260_001Energie Wasser BernDismissedProduction unavailability2026-08-01 07:00:002026-09-30 17:00:00Planned2024-10-15 10:56:58MW43.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
2590000000000000000000000158_003Energie Wasser BernInactiveProduction unavailability2025-08-01 07:00:002025-09-30 17:00:00Planned2024-10-15 10:13:38MW43.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
2580000000000000000000000158_002Energie Wasser BernDismissedProduction unavailability2025-08-10 07:00:002025-09-18 17:00:00Planned2024-10-15 10:12:08MW43.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
2570000000000000000000000254_004Ineos oxide utilities NVInactiveProduction unavailability2024-07-27 01:00:002024-07-30 18:00:00Unplanned2024-07-30 15:48:15MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2560000000000000000000000254_003Ineos oxide utilities NVDismissedProduction unavailability2024-07-27 01:00:002024-07-31 18:00:00Unplanned2024-07-30 15:47:57MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2550000000000000000000000254_002Ineos oxide utilities NVDismissedProduction unavailability2024-07-27 01:00:002024-07-31 23:55:00Unplanned2024-07-27 13:26:05MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2540000000000000000000000254_001Ineos oxide utilities NVDismissedProduction unavailability2024-07-27 01:00:002024-07-29 18:00:00Unplanned2024-07-26 22:56:12MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2530000000000000000000000248_005Ineos oxide utilities NVInactiveProduction unavailability2024-07-23 02:00:002024-07-23 15:00:00Unplanned2024-07-23 13:01:32MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2520000000000000000000000248_004Ineos oxide utilities NVDismissedProduction unavailability2024-07-23 02:00:002024-07-23 15:30:00Unplanned2024-07-23 11:54:10MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2510000000000000000000000248_003Ineos oxide utilities NVDismissedProduction unavailability2024-07-23 02:00:002024-07-23 13:30:00Unplanned2024-07-23 11:18:17MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2500000000000000000000000250_001Ineos oxide utilities NVInactiveProduction unavailability2024-07-24 08:00:002024-07-24 16:00:00Planned2024-07-23 08:05:20MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2490000000000000000000000248_002Ineos oxide utilities NVDismissedProduction unavailability2024-07-23 02:00:002024-07-23 18:00:00Unplanned2024-07-23 01:19:56MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2480000000000000000000000248_001Ineos oxide utilities NVDismissedProduction unavailability2024-07-23 02:00:002024-07-23 06:00:00Unplanned2024-07-23 01:00:15MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2470000000000000000000000247_001Ineos oxide utilities NVInactiveProduction unavailability2024-07-03 00:00:002024-07-04 00:00:00Planned2024-07-02 12:04:48MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2460000000000000000000000243_003Ineos oxide utilities NVInactiveProduction unavailability2024-06-28 05:00:002024-07-01 16:30:00Planned2024-07-01 13:28:16MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2450000000000000000000000243_002Ineos oxide utilities NVDismissedProduction unavailability2024-06-28 05:00:002024-07-02 11:00:00Planned2024-07-01 08:15:26MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2440000000000000000000000237_007Ineos oxide utilities NVInactiveProduction unavailability2024-06-26 18:15:002024-06-28 05:00:00Unplanned2024-06-28 14:50:43MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
Showing 1-10 of 10 items.
 IDMessage IDMp NameEvent StatusEvent Start (UTC)Event Stop (UTC)Publication date/time (UTC)Remarks
 
 
×
×
×
210000000000000000000000019_002Swissgrid AGInactive2026-06-24 09:00:002026-06-24 14:00:002026-06-24 14:30:02Please be informed that on Wednesday, 24 June 2026, from 09:00 CEST to 14:00 CEST, Swissgrid experienced an internal issue that disrupted data delivery processes to the Transparency Platform. As a result, all data items scheduled for submission during this period were affected.
Swissgrid is currently working to restore normal data delivery and to backfill the affected data.
We apologize for any inconvenience this may have caused and appreciate your understanding.
190000000000000000000000019_001Swissgrid AGActive2026-06-24 09:00:002026-06-24 14:00:002026-06-24 14:23:23Please be informed that on Wednesday, 24 June 2026, from 09:00 CEST to 14:00 CEST, Swissgrid experienced an internal issue that disrupted data delivery processes to the Transparency Platform. As a result, all data items scheduled for submission during this period were affected.
Swissgrid is currently working to restore normal data delivery and to backfill the affected data.
We apologize for any inconvenience this may have caused and appreciate your understanding.
180000000000000000000000018_001MET International AGActive2025-07-17 00:00:00(not set)2025-07-29 15:55:33MET International AG's regasification capacity is available due to termination of the TUA by MET International AG pursuant to its terms.
160000000000000000000000016_001Swissgrid AGInactive2026-02-01 00:00:002026-05-15 23:55:002025-06-20 12:30:16Information about the Swiss hydropower reserve administrated by Swissgrid on behalf of the Swiss national regulator ElCom according to the Swiss Ordinance on the establishment of a hydropower reserve is available on the website of ElCom. Today ElCom fixed a total energy volume of 250 GWh for the coming winter period (01 February 2026 until 15 May 2026). See https://www.elcom.admin.ch/elcom/de/home/dokumentation/weisungen.html
150000000000000000000000015_001Swissgrid AGInactive2025-02-18 08:00:002025-02-18 10:00:002025-02-14 13:53:46Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with a thermal reserve power plant between 18/02/2025 08:00 and 18/02/2025 10:00. During this period, an excess of approx. 500 MWh will be fed into the grid, which may have an impact on prices.
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.