 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityTechnical CapacityBalancing Zone 1Affected Asset Name
 
 
 
×
×
 
×
 
 
890000000000000000000000089_001MET Speicher GmbHInactiveInjection unavailability2023-02-28 18:00:002023-03-15 18:00:00Planned2023-02-28 10:40:36GWh/d24.744000.0000024.7440037Y005053MH0000RUGS Reckrod
880000000000000000000000088_001MET Speicher GmbHInactiveWithdrawal unavailability2022-12-06 06:00:002022-12-08 16:00:00Planned2022-12-05 14:34:56GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
870000000000000000000000087_001MET Speicher GmbHInactiveWithdrawal unavailability2022-11-28 06:00:002022-11-30 06:00:00Planned2022-11-27 10:09:25GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
860000000000000000000000080_002MET Speicher GmbHInactiveStorage unavailability2023-04-04 16:00:002023-05-09 16:00:00Planned2022-11-16 16:42:06GWh15.000001427.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
850000000000000000000000079_002MET Speicher GmbHInactiveWithdrawal unavailability2023-04-04 16:00:002023-05-09 16:00:00Planned2022-11-16 16:41:38kWh/h70000.000001845000.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
840000000000000000000000078_002MET Speicher GmbHInactiveStorage unavailability2023-03-17 08:00:002023-04-04 16:00:00Planned2022-11-16 16:40:51GWh32.000001410.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
830000000000000000000000077_002MET Speicher GmbHInactiveWithdrawal unavailability2023-03-17 08:00:002023-04-04 16:00:00Planned2022-11-16 16:40:32kWh/h155500.000001759500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
820000000000000000000000076_002MET Speicher GmbHInactiveStorage unavailability2023-02-10 08:00:002023-03-17 08:00:00Planned2022-11-16 16:39:02GWh17.000001425.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
810000000000000000000000075_002MET Speicher GmbHInactiveWithdrawal unavailability2023-02-10 08:00:002023-03-17 08:00:00Planned2022-11-16 16:37:23kWh/h85500.000001829500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
800000000000000000000000080_001MET Speicher GmbHDismissedStorage unavailability2023-04-04 16:00:002023-05-24 16:00:00Planned2022-11-11 15:56:34GWh15.000001427.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
790000000000000000000000079_001MET Speicher GmbHDismissedWithdrawal unavailability2023-04-04 16:00:002023-05-24 16:00:00Planned2022-11-11 15:56:21kWh/h70000.000001845000.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
780000000000000000000000078_001MET Speicher GmbHDismissedStorage unavailability2023-03-15 08:00:002023-04-04 16:00:00Planned2022-11-11 15:56:03GWh32.000001410.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
770000000000000000000000077_001MET Speicher GmbHDismissedWithdrawal unavailability2023-03-15 08:00:002023-04-04 16:00:00Planned2022-11-11 15:55:50kWh/h155500.000001759500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
760000000000000000000000076_001MET Speicher GmbHDismissedStorage unavailability2023-02-10 08:00:002023-03-15 08:00:00Planned2022-11-11 15:55:29GWh17.000001425.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
750000000000000000000000075_001MET Speicher GmbHDismissedWithdrawal unavailability2023-02-10 08:00:002023-03-15 08:00:00Planned2022-11-11 15:55:15kWh/h85500.000001829500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
740000000000000000000000074_001MET Speicher GmbHInactiveTransmission system unavailability2023-09-20 08:00:002023-09-20 18:00:00Planned2022-11-11 14:59:13kWh/h418977.000000.00000418977.0000021YNL----TTF---1UGS Etzel-ESE MET
730000000000000000000000048_003MET Speicher GmbHInactiveStorage unavailability2022-10-18 06:00:002022-11-04 06:00:00Planned2022-11-03 18:13:45GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
720000000000000000000000048_002MET Speicher GmbHDismissedStorage unavailability2022-10-18 06:00:002022-11-11 16:00:00Planned2022-10-13 06:22:49GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
710000000000000000000000058_002MET Speicher GmbHInactiveInjection unavailability2022-10-10 08:00:002022-12-16 16:00:00Planned2022-09-23 09:17:44kWh/h752000.000001505000.000002257000.0000037Y005053MH0000RUGS Etzel-ESE MET
700000000000000000000000038_004MET Speicher GmbHInactiveStorage unavailability2022-10-09 06:00:002022-10-15 18:00:00Planned2022-09-23 09:11:28GWh1442.000000.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
Showing 21-40 of 201 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityInstalled CapacityFuel TypeBidding ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
2610000000000000000000000261_001Energie Wasser BernActiveProduction unavailability2027-08-01 07:00:002027-09-30 17:00:00Planned2024-10-15 10:59:28MW43.500000.0000043.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
2600000000000000000000000260_001Energie Wasser BernActiveProduction unavailability2026-08-01 07:00:002026-09-30 17:00:00Planned2024-10-15 10:56:58MW43.500000.0000043.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
2590000000000000000000000158_003Energie Wasser BernActiveProduction unavailability2025-08-01 07:00:002025-09-30 17:00:00Planned2024-10-15 10:13:38MW43.500000.0000043.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
2580000000000000000000000158_002Energie Wasser BernDismissedProduction unavailability2025-08-10 07:00:002025-09-18 17:00:00Planned2024-10-15 10:12:08MW43.500000.0000043.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
2570000000000000000000000254_004Ineos oxide utilities NVInactiveProduction unavailability2024-07-27 01:00:002024-07-30 18:00:00Unplanned2024-07-30 15:48:15MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2560000000000000000000000254_003Ineos oxide utilities NVDismissedProduction unavailability2024-07-27 01:00:002024-07-31 18:00:00Unplanned2024-07-30 15:47:57MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2550000000000000000000000254_002Ineos oxide utilities NVDismissedProduction unavailability2024-07-27 01:00:002024-07-31 23:55:00Unplanned2024-07-27 13:26:05MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2540000000000000000000000254_001Ineos oxide utilities NVDismissedProduction unavailability2024-07-27 01:00:002024-07-29 18:00:00Unplanned2024-07-26 22:56:12MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2530000000000000000000000248_005Ineos oxide utilities NVInactiveProduction unavailability2024-07-23 02:00:002024-07-23 15:00:00Unplanned2024-07-23 13:01:32MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2520000000000000000000000248_004Ineos oxide utilities NVDismissedProduction unavailability2024-07-23 02:00:002024-07-23 15:30:00Unplanned2024-07-23 11:54:10MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2510000000000000000000000248_003Ineos oxide utilities NVDismissedProduction unavailability2024-07-23 02:00:002024-07-23 13:30:00Unplanned2024-07-23 11:18:17MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2500000000000000000000000250_001Ineos oxide utilities NVInactiveProduction unavailability2024-07-24 08:00:002024-07-24 16:00:00Planned2024-07-23 08:05:20MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2490000000000000000000000248_002Ineos oxide utilities NVDismissedProduction unavailability2024-07-23 02:00:002024-07-23 18:00:00Unplanned2024-07-23 01:19:56MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2480000000000000000000000248_001Ineos oxide utilities NVDismissedProduction unavailability2024-07-23 02:00:002024-07-23 06:00:00Unplanned2024-07-23 01:00:15MW76.0000063.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2470000000000000000000000247_001Ineos oxide utilities NVInactiveProduction unavailability2024-07-03 00:00:002024-07-04 00:00:00Planned2024-07-02 12:04:48MW50.0000089.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2460000000000000000000000243_003Ineos oxide utilities NVInactiveProduction unavailability2024-06-28 05:00:002024-07-01 16:30:00Planned2024-07-01 13:28:16MW71.5000067.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2450000000000000000000000243_002Ineos oxide utilities NVDismissedProduction unavailability2024-06-28 05:00:002024-07-02 11:00:00Planned2024-07-01 08:15:26MW71.5000067.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2440000000000000000000000237_007Ineos oxide utilities NVInactiveProduction unavailability2024-06-26 18:15:002024-06-28 05:00:00Unplanned2024-06-28 14:50:43MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2430000000000000000000000243_001Ineos oxide utilities NVDismissedProduction unavailability2024-06-28 05:00:002024-07-02 00:00:00Planned2024-06-28 14:50:24MW71.5000067.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2420000000000000000000000237_006Ineos oxide utilities NVDismissedProduction unavailability2024-06-26 18:15:002024-06-28 18:00:00Unplanned2024-06-27 13:01:44MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
Showing 1-5 of 5 items.
 IDMessage IDMarket Participant NameEvent StatusEvent StartEvent StopPublication date/timeRemarks
 
 
×
×
×
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.

The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh.