Showing 1-20 of 75 items.
 IDMessage IDMp NameEvent StatusType of EventEvent Start (UTC)Event Stop (UTC)Type of UnavailabilityPublication date/time (UTC)Unit of MeasurementUnavailable CapacityAvailable CapacityTechnical CapacityBalancing ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
910000000000000000000000091_001Bayernugs GmbHActiveStorage facility unavailability2027-04-01 06:00:002029-12-31 06:00:00Planned2025-12-23 08:38:27GWh4088.000000.000004088.0000021X000000001052MStorage Wolfersberg
890000000000000000000000089_001MET Speicher GmbHInactiveInjection unavailability2023-02-28 18:00:002023-03-15 18:00:00Planned2023-02-28 10:40:36GWh/d24.744000.0000024.7440037Y005053MH0000RUGS Reckrod
880000000000000000000000088_001MET Speicher GmbHInactiveWithdrawal unavailability2022-12-06 06:00:002022-12-08 16:00:00Planned2022-12-05 14:34:56GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
870000000000000000000000087_001MET Speicher GmbHInactiveWithdrawal unavailability2022-11-28 06:00:002022-11-30 06:00:00Planned2022-11-27 10:09:25GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
860000000000000000000000080_002MET Speicher GmbHInactiveStorage unavailability2023-04-04 16:00:002023-05-09 16:00:00Planned2022-11-16 16:42:06GWh15.000001427.000001442.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
850000000000000000000000079_002MET Speicher GmbHInactiveWithdrawal unavailability2023-04-04 16:00:002023-05-09 16:00:00Planned2022-11-16 16:41:38kWh/h70000.000001845000.000001915000.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
840000000000000000000000078_002MET Speicher GmbHInactiveStorage unavailability2023-03-17 08:00:002023-04-04 16:00:00Planned2022-11-16 16:40:51GWh32.000001410.000001442.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
830000000000000000000000077_002MET Speicher GmbHInactiveWithdrawal unavailability2023-03-17 08:00:002023-04-04 16:00:00Planned2022-11-16 16:40:32kWh/h155500.000001759500.000001915000.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
820000000000000000000000076_002MET Speicher GmbHInactiveStorage unavailability2023-02-10 08:00:002023-03-17 08:00:00Planned2022-11-16 16:39:02GWh17.000001425.000001442.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
810000000000000000000000075_002MET Speicher GmbHInactiveWithdrawal unavailability2023-02-10 08:00:002023-03-17 08:00:00Planned2022-11-16 16:37:23kWh/h85500.000001829500.000001915000.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
800000000000000000000000080_001MET Speicher GmbHDismissedStorage unavailability2023-04-04 16:00:002023-05-24 16:00:00Planned2022-11-11 15:56:34GWh15.000001427.000001442.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
790000000000000000000000079_001MET Speicher GmbHDismissedWithdrawal unavailability2023-04-04 16:00:002023-05-24 16:00:00Planned2022-11-11 15:56:21kWh/h70000.000001845000.000001915000.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
780000000000000000000000078_001MET Speicher GmbHDismissedStorage unavailability2023-03-15 08:00:002023-04-04 16:00:00Planned2022-11-11 15:56:03GWh32.000001410.000001442.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
770000000000000000000000077_001MET Speicher GmbHDismissedWithdrawal unavailability2023-03-15 08:00:002023-04-04 16:00:00Planned2022-11-11 15:55:50kWh/h155500.000001759500.000001915000.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
760000000000000000000000076_001MET Speicher GmbHDismissedStorage unavailability2023-02-10 08:00:002023-03-15 08:00:00Planned2022-11-11 15:55:29GWh17.000001425.000001442.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
750000000000000000000000075_001MET Speicher GmbHDismissedWithdrawal unavailability2023-02-10 08:00:002023-03-15 08:00:00Planned2022-11-11 15:55:15kWh/h85500.000001829500.000001915000.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
740000000000000000000000074_001MET Speicher GmbHInactiveTransmission system unavailability2023-09-20 08:00:002023-09-20 18:00:00Planned2022-11-11 14:59:13kWh/h418977.000000.00000418977.0000021YNL----TTF---1UGS Etzel-ESE MET
730000000000000000000000048_003MET Speicher GmbHInactiveStorage unavailability2022-10-18 06:00:002022-11-04 06:00:00Planned2022-11-03 18:13:45GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
720000000000000000000000048_002MET Speicher GmbHDismissedStorage unavailability2022-10-18 06:00:002022-11-11 16:00:00Planned2022-10-13 06:22:49GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
710000000000000000000000058_002MET Speicher GmbHInactiveInjection unavailability2022-10-10 08:00:002022-12-16 16:00:00Planned2022-09-23 09:17:44kWh/h752000.000001505000.000002257000.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
Showing 101-120 of 343 items.
 IDMessage IDMp NameEvent StatusType of EventEvent Start (UTC)Event Stop (UTC)Type of UnavailabilityPublication date/time (UTC)Unit of MeasurementInstalled CapacityFuel TypeBidding ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
 
3380000000000000000000000310_003Ineos oxide utilities NVDismissedProduction unavailability2025-04-25 12:00:002025-05-29 00:00:00Planned2025-05-19 08:38:14MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3360000000000000000000000312_002Ineos oxide utilities NVDismissedProduction unavailability2025-06-02 12:00:002025-06-08 00:00:00Planned2025-05-19 08:25:33MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3340000000000000000000000333_002Ineos oxide utilities NVInactiveProduction unavailability2025-05-16 08:00:002025-05-16 16:45:00Planned2025-05-16 14:39:31MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3330000000000000000000000333_001Ineos oxide utilities NVDismissedProduction unavailability2025-05-16 08:00:002025-05-17 00:00:00Planned2025-05-13 08:13:00MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3310000000000000000000000325_006Ineos oxide utilities NVDismissedProduction unavailability2025-05-08 17:30:002025-05-09 18:00:00Unplanned2025-05-09 14:14:40MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3300000000000000000000000325_005Ineos oxide utilities NVDismissedProduction unavailability2025-05-08 17:30:002025-05-09 18:00:00Unplanned2025-05-09 05:42:26MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3290000000000000000000000325_004Ineos oxide utilities NVDismissedProduction unavailability2025-05-08 17:30:002025-05-09 08:00:00Unplanned2025-05-09 05:41:45MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3280000000000000000000000325_003Ineos oxide utilities NVDismissedProduction unavailability2025-05-08 17:30:002025-05-09 08:00:00Unplanned2025-05-08 22:00:14MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3260000000000000000000000325_002Ineos oxide utilities NVDismissedProduction unavailability2025-05-08 17:30:002025-05-09 00:30:00Unplanned2025-05-08 19:00:42MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3250000000000000000000000325_001Ineos oxide utilities NVDismissedProduction unavailability2025-05-08 17:30:002025-05-08 21:30:00Unplanned2025-05-08 16:03:20MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3230000000000000000000000322_002Ineos oxide utilities NVInactiveProduction unavailability2025-05-02 15:50:002025-05-02 23:50:00Unplanned2025-05-02 21:44:40MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3220000000000000000000000322_001Ineos oxide utilities NVDismissedProduction unavailability2025-05-02 15:50:002025-05-05 12:00:00Unplanned2025-05-02 14:15:28MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3210000000000000000000000321_001Ineos oxide utilities NVInactiveProduction unavailability2025-05-01 19:00:002025-05-02 12:00:00Unplanned2025-05-01 17:51:42MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3200000000000000000000000320_001Ineos oxide utilities NVInactiveProduction unavailability2025-04-27 09:00:002025-04-27 18:00:00Unplanned2025-04-27 07:55:53MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3190000000000000000000000319_001Ineos oxide utilities NVInactiveProduction unavailability2025-04-26 19:00:002025-04-26 21:00:00Unplanned2025-04-26 18:57:47MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3180000000000000000000000310_002Ineos oxide utilities NVDismissedProduction unavailability2025-04-25 12:00:002025-05-27 00:00:00Planned2025-04-22 09:01:56MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3160000000000000000000000316_001Ineos oxide utilities NVInactiveProduction unavailability2025-06-20 00:00:002025-07-01 00:00:00Planned2025-04-15 07:21:58MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3140000000000000000000000314_001Ineos oxide utilities NVDismissedProduction unavailability2025-06-08 00:00:002025-06-20 00:00:00Planned2025-04-15 07:20:18MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3120000000000000000000000312_001Ineos oxide utilities NVDismissedProduction unavailability2025-05-30 12:00:002025-06-08 00:00:00Planned2025-04-15 07:18:08MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
3100000000000000000000000310_001Ineos oxide utilities NVDismissedProduction unavailability2025-04-24 12:00:002025-05-27 00:00:00Planned2025-04-15 07:16:38MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
Showing 1-10 of 10 items.
 IDMessage IDMp NameEvent StatusEvent Start (UTC)Event Stop (UTC)Publication date/time (UTC)Remarks
 
 
×
×
×
210000000000000000000000019_002Swissgrid AGInactive2026-06-24 09:00:002026-06-24 14:00:002026-06-24 14:30:02Please be informed that on Wednesday, 24 June 2026, from 09:00 CEST to 14:00 CEST, Swissgrid experienced an internal issue that disrupted data delivery processes to the Transparency Platform. As a result, all data items scheduled for submission during this period were affected.
Swissgrid is currently working to restore normal data delivery and to backfill the affected data.
We apologize for any inconvenience this may have caused and appreciate your understanding.
190000000000000000000000019_001Swissgrid AGActive2026-06-24 09:00:002026-06-24 14:00:002026-06-24 14:23:23Please be informed that on Wednesday, 24 June 2026, from 09:00 CEST to 14:00 CEST, Swissgrid experienced an internal issue that disrupted data delivery processes to the Transparency Platform. As a result, all data items scheduled for submission during this period were affected.
Swissgrid is currently working to restore normal data delivery and to backfill the affected data.
We apologize for any inconvenience this may have caused and appreciate your understanding.
180000000000000000000000018_001MET International AGActive2025-07-17 00:00:00(not set)2025-07-29 15:55:33MET International AG's regasification capacity is available due to termination of the TUA by MET International AG pursuant to its terms.
160000000000000000000000016_001Swissgrid AGInactive2026-02-01 00:00:002026-05-15 23:55:002025-06-20 12:30:16Information about the Swiss hydropower reserve administrated by Swissgrid on behalf of the Swiss national regulator ElCom according to the Swiss Ordinance on the establishment of a hydropower reserve is available on the website of ElCom. Today ElCom fixed a total energy volume of 250 GWh for the coming winter period (01 February 2026 until 15 May 2026). See https://www.elcom.admin.ch/elcom/de/home/dokumentation/weisungen.html
150000000000000000000000015_001Swissgrid AGInactive2025-02-18 08:00:002025-02-18 10:00:002025-02-14 13:53:46Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with a thermal reserve power plant between 18/02/2025 08:00 and 18/02/2025 10:00. During this period, an excess of approx. 500 MWh will be fed into the grid, which may have an impact on prices.
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.

The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh.