ID | Nachrichten ID | Marktteilnehmer Name | Ereignisstatus | Ereignistyp | Ereignis Start | Ereignis Stop | Typ der Nichtverfügbarkeit | Veröffentlichungsdatum / -zeit | Maßeinheit | Nicht verfügbare Kapazität | Verfügbare Kapazität | Technische Kapazität | Bilanzierungszone 1 | Name der Anlage | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| |||||||||||||
24 | 0000000000000000000000022_002 | astora GmbH and Co. KG | Inactive | Injection unavailability | 2021-10-26 16:00:00 | 2021-11-17 22:00:00 | Planned | 2021-05-28 08:18:49 | KWh/h | 1033083.00000 | 3099249.00000 | 4132332.00000 | 37Y701133MH0000P | UGS Haidach - Astora - Injection | |
23 | 0000000000000000000000023_001 | astora GmbH and Co. KG | Inactive | Injection unavailability | 2021-10-19 16:00:00 | 2021-10-26 16:00:00 | Planned | 2021-05-28 08:11:06 | KWh/h | 2066166.00000 | 2066166.00000 | 4132332.00000 | 37Y701133MH0000P | UGS Haidach - Astora - Injection | |
79 | 0000000000000000000000079_001 | MET Speicher GmbH | Dismissed | Withdrawal unavailability | 2023-04-04 16:00:00 | 2023-05-24 16:00:00 | Planned | 2022-11-11 15:56:21 | kWh/h | 70000.00000 | 1845000.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
85 | 0000000000000000000000079_002 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2023-04-04 16:00:00 | 2023-05-09 16:00:00 | Planned | 2022-11-16 16:41:38 | kWh/h | 70000.00000 | 1845000.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
75 | 0000000000000000000000075_001 | MET Speicher GmbH | Dismissed | Withdrawal unavailability | 2023-02-10 08:00:00 | 2023-03-15 08:00:00 | Planned | 2022-11-11 15:55:15 | kWh/h | 85500.00000 | 1829500.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
81 | 0000000000000000000000075_002 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2023-02-10 08:00:00 | 2023-03-17 08:00:00 | Planned | 2022-11-16 16:37:23 | kWh/h | 85500.00000 | 1829500.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
36 | 0000000000000000000000036_001 | MET Speicher GmbH | Dismissed | Withdrawal unavailability | 2022-03-17 18:00:00 | 2022-05-13 16:00:00 | Planned | 2022-01-03 16:53:15 | kWh/h | 95750.00000 | 1819250.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
50 | 0000000000000000000000036_002 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-03-17 18:00:00 | 2022-05-20 16:00:00 | Planned | 2022-04-28 13:07:34 | kWh/h | 95750.00000 | 1819250.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
77 | 0000000000000000000000077_001 | MET Speicher GmbH | Dismissed | Withdrawal unavailability | 2023-03-15 08:00:00 | 2023-04-04 16:00:00 | Planned | 2022-11-11 15:55:50 | kWh/h | 155500.00000 | 1759500.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
83 | 0000000000000000000000077_002 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2023-03-17 08:00:00 | 2023-04-04 16:00:00 | Planned | 2022-11-16 16:40:32 | kWh/h | 155500.00000 | 1759500.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
32 | 0000000000000000000000032_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-01-03 08:00:00 | 2022-01-16 16:00:00 | Planned | 2022-01-03 16:51:54 | kWh/h | 750750.00000 | 1524250.00000 | 2275000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
33 | 0000000000000000000000033_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-01-17 08:00:00 | 2022-03-25 16:00:00 | Planned | 2022-01-03 16:52:30 | kWh/h | 750750.00000 | 1524250.00000 | 2275000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
71 | 0000000000000000000000058_002 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-10-10 08:00:00 | 2022-12-16 16:00:00 | Planned | 2022-09-23 09:17:44 | kWh/h | 752000.00000 | 1505000.00000 | 2257000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
34 | 0000000000000000000000034_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-01-17 08:00:00 | 2022-03-25 16:00:00 | Planned | 2022-01-03 16:52:47 | kWh/h | 631950.00000 | 1283050.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
58 | 0000000000000000000000058_001 | MET Speicher GmbH | Dismissed | Injection unavailability | 2022-10-10 08:00:00 | 2022-12-16 16:00:00 | Planned | 2022-05-16 15:08:19 | kWh/h | 640000.00000 | 1275000.00000 | 1915000.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
22 | 0000000000000000000000022_001 | astora GmbH and Co. KG | Dismissed | Injection unavailability | 2021-10-26 16:00:00 | 2021-11-17 22:00:00 | Planned | 2021-05-28 08:06:38 | KWh/h | 3099249.00000 | 1033083.00000 | 4132332.00000 | 37Y701133MH0000P | UGS Haidach - Astora - Injection | |
45 | 0000000000000000000000045_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-07-18 06:00:00 | 2022-07-22 16:00:00 | Planned | 2022-04-25 15:20:44 | kWh/h | 1031500.00000 | 1031500.00000 | 2063000.00000 | 37Y005053MH0000R | UGS Reckrod | |
47 | 0000000000000000000000047_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-07-25 06:00:00 | 2022-07-29 16:00:00 | Planned | 2022-04-25 15:22:28 | kWh/h | 1031500.00000 | 1031500.00000 | 2063000.00000 | 37Y005053MH0000R | UGS Reckrod | |
44 | 0000000000000000000000044_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-07-18 06:00:00 | 2022-07-22 16:00:00 | Planned | 2022-04-25 15:19:50 | kWh/h | 515500.00000 | 515500.00000 | 1031000.00000 | 37Y005053MH0000R | UGS Reckrod | |
46 | 0000000000000000000000046_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-07-25 06:00:00 | 2022-07-29 16:00:00 | Planned | 2022-04-25 15:21:37 | kWh/h | 515500.00000 | 515500.00000 | 1031000.00000 | 37Y005053MH0000R | UGS Reckrod |
ID | Nachrichten ID | Marktteilnehmer Name | Ereignisstatus | Ereignistyp | Ereignis Start | Ereignis Stop | Typ der Nichtverfügbarkeit | Veröffentlichungsdatum / -zeit | Maßeinheit | Nicht verfügbare Kapazität | Verfügbare Kapazität | Installierte Kapazität | Kraftstofftyp | Gebotszone | Name der Anlage | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| ||||||||||||||
105 | 0000000000000000000000105_001 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-02-05 12:15:00 | 2023-02-07 00:00:00 | Unplanned | 2023-02-05 11:21:51 | MW | 0.00000 | 139.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
134 | 0000000000000000000000134_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-05-04 20:10:00 | 2023-05-05 13:00:00 | Unplanned | 2023-05-04 18:28:46 | MW | 4.50000 | 134.50000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
135 | 0000000000000000000000134_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-05-04 20:10:00 | 2023-05-15 00:00:00 | Unplanned | 2023-05-05 08:01:17 | MW | 4.50000 | 134.50000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
136 | 0000000000000000000000134_003 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-05-04 20:10:00 | 2023-05-20 00:00:00 | Unplanned | 2023-05-12 08:58:37 | MW | 4.50000 | 134.50000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
106 | 0000000000000000000000106_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-02-12 22:35:00 | 2023-02-13 23:55:00 | Unplanned | 2023-02-12 21:26:46 | MW | 9.00000 | 130.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
107 | 0000000000000000000000106_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-02-12 22:35:00 | 2023-02-13 23:55:00 | Unplanned | 2023-02-13 08:26:34 | MW | 9.00000 | 130.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
154 | 0000000000000000000000154_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-06-12 21:15:00 | 2023-06-13 23:05:00 | Unplanned | 2023-06-12 19:10:48 | MW | 10.00000 | 129.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
155 | 0000000000000000000000154_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-06-12 21:15:00 | 2023-07-01 00:00:00 | Unplanned | 2023-06-13 09:08:18 | MW | 10.00000 | 129.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
156 | 0000000000000000000000154_003 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-06-12 21:15:00 | 2023-06-16 14:25:00 | Unplanned | 2023-06-16 12:21:44 | MW | 10.00000 | 129.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
217 | 0000000000000000000000217_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-01-25 18:00:00 | 2024-01-27 00:00:00 | Unplanned | 2024-01-25 18:06:05 | MW | 10.00000 | 129.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
218 | 0000000000000000000000217_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-01-25 18:00:00 | 2024-01-27 00:00:00 | Unplanned | 2024-01-25 18:07:12 | MW | 10.00000 | 129.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
219 | 0000000000000000000000217_003 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-01-25 18:00:00 | 2024-01-11 00:40:00 | Unplanned | 2024-01-26 10:41:02 | MW | 10.00000 | 129.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
220 | 0000000000000000000000217_004 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-01-25 18:00:00 | 2024-01-11 00:40:00 | Unplanned | 2024-01-27 07:34:16 | MW | 10.00000 | 129.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
221 | 0000000000000000000000217_005 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-01-25 18:00:00 | 2024-01-26 11:40:00 | Unplanned | 2024-01-27 07:35:09 | MW | 10.00000 | 129.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
222 | 0000000000000000000000222_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-02-08 20:15:00 | 2024-02-10 00:00:00 | Unplanned | 2024-02-08 19:18:16 | MW | 25.00000 | 114.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
223 | 0000000000000000000000222_002 | Ineos oxide utilities NV | Inactive | Production unavailability | 2024-02-08 20:15:00 | 2024-02-09 14:30:00 | Unplanned | 2024-02-09 13:32:23 | MW | 25.00000 | 114.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
137 | 0000000000000000000000137_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-05-13 21:00:00 | 2023-05-15 00:00:00 | Unplanned | 2023-05-13 19:19:52 | MW | 30.00000 | 109.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
138 | 0000000000000000000000137_002 | Ineos oxide utilities NV | Inactive | Production unavailability | 2023-05-13 21:00:00 | 2023-05-17 00:00:00 | Unplanned | 2023-05-14 16:02:25 | MW | 30.00000 | 109.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
199 | 0000000000000000000000199_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-12-23 10:00:00 | 2023-12-27 00:00:00 | Unplanned | 2023-12-23 08:52:04 | MW | 30.00000 | 109.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
200 | 0000000000000000000000199_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2023-12-23 10:00:00 | 2023-12-28 00:00:00 | Unplanned | 2023-12-26 09:06:02 | MW | 30.00000 | 109.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK |
ID | Nachrichten ID | Marktteilnehmer Name | Ereignisstatus | Ereignis Start | Ereignis Stop | Veröffentlichungsdatum / -zeit | Bemerkungen | |
---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| ||||||
14 | 0000000000000000000000012_002 | Swissgrid AG | Dismissed | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-14 17:40:34 | Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices. | |
13 | 0000000000000000000000013_001 | Swissgrid AG | Inactive | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-14 17:27:59 | UPDATE (reduced amount of energy) Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices. | |
12 | 0000000000000000000000012_001 | Swissgrid AG | Dismissed | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-13 15:04:43 | Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices. | |
11 | 0000000000000000000000011_001 | Swissgrid AG | Inactive | 2022-12-01 00:00:00 | 2023-05-15 23:55:00 | 2022-10-25 13:42:46 | Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html | |
10 | 0000000000000000000000010_001 | Swissgrid AG | Inactive | 2020-12-21 00:00:00 | 2022-01-05 00:00:00 | 2021-12-23 09:12:31 | A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh. The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh. |