ID | Message ID | Market Participant Name | Event Status | Type of Event | Event Start | Event Stop | Type of Unavailability | Publication date/time | Unit of Measurement | Unavailable Capacity | Available Capacity | Technical Capacity | Balancing Zone 1 | Affected Asset Name | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| |||||||||||||
35 | 0000000000000000000000035_001 | MET Speicher GmbH | Dismissed | Storage unavailability | 2022-03-17 18:00:00 | 2022-05-13 16:00:00 | Planned | 2022-01-03 16:53:00 | GWh | 11.75600 | 1473.24400 | 1485.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
38 | 0000000000000000000000038_001 | MET Speicher GmbH | Dismissed | Storage unavailability | 2022-10-09 06:00:00 | 2022-10-15 18:00:00 | Planned | 2022-01-03 16:53:35 | GWh | 1485.00000 | 0.00000 | 1485.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
39 | 0000000000000000000000039_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2022-05-26 06:00:00 | 2022-07-22 18:00:00 | Planned | 2022-03-17 08:54:32 | GWh | 68.44000 | 1373.56000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
40 | 0000000000000000000000040_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-05-26 06:00:00 | 2022-07-22 18:00:00 | Planned | 2022-03-17 08:54:49 | GWh | 24.97000 | 1417.03000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
48 | 0000000000000000000000048_001 | MET Speicher GmbH | Dismissed | Storage unavailability | 2022-10-17 06:00:00 | 2022-11-11 16:00:00 | Planned | 2022-04-25 15:23:18 | GWh | 1461.00000 | 0.00000 | 1461.00000 | 37Y005053MH0000R | UGS Reckrod | |
49 | 0000000000000000000000035_002 | MET Speicher GmbH | Inactive | Storage unavailability | 2022-03-17 18:00:00 | 2022-05-20 16:00:00 | Planned | 2022-04-28 13:06:39 | GWh | 11.75600 | 1473.24400 | 1485.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
56 | 0000000000000000000000038_002 | MET Speicher GmbH | Dismissed | Storage unavailability | 2022-10-07 06:00:00 | 2022-10-15 18:00:00 | Planned | 2022-05-16 07:16:06 | GWh | 1485.00000 | 0.00000 | 1485.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
69 | 0000000000000000000000038_003 | MET Speicher GmbH | Dismissed | Storage unavailability | 2022-10-09 06:00:00 | 2022-10-17 18:00:00 | Planned | 2022-05-27 07:27:36 | GWh | 1485.00000 | 0.00000 | 1485.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
70 | 0000000000000000000000038_004 | MET Speicher GmbH | Inactive | Storage unavailability | 2022-10-09 06:00:00 | 2022-10-15 18:00:00 | Planned | 2022-09-23 09:11:28 | GWh | 1442.00000 | 0.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
72 | 0000000000000000000000048_002 | MET Speicher GmbH | Dismissed | Storage unavailability | 2022-10-18 06:00:00 | 2022-11-11 16:00:00 | Planned | 2022-10-13 06:22:49 | GWh | 1461.00000 | 0.00000 | 1461.00000 | 37Y005053MH0000R | UGS Reckrod | |
73 | 0000000000000000000000048_003 | MET Speicher GmbH | Inactive | Storage unavailability | 2022-10-18 06:00:00 | 2022-11-04 06:00:00 | Planned | 2022-11-03 18:13:45 | GWh | 1461.00000 | 0.00000 | 1461.00000 | 37Y005053MH0000R | UGS Reckrod | |
76 | 0000000000000000000000076_001 | MET Speicher GmbH | Dismissed | Storage unavailability | 2023-02-10 08:00:00 | 2023-03-15 08:00:00 | Planned | 2022-11-11 15:55:29 | GWh | 17.00000 | 1425.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
78 | 0000000000000000000000078_001 | MET Speicher GmbH | Dismissed | Storage unavailability | 2023-03-15 08:00:00 | 2023-04-04 16:00:00 | Planned | 2022-11-11 15:56:03 | GWh | 32.00000 | 1410.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
80 | 0000000000000000000000080_001 | MET Speicher GmbH | Dismissed | Storage unavailability | 2023-04-04 16:00:00 | 2023-05-24 16:00:00 | Planned | 2022-11-11 15:56:34 | GWh | 15.00000 | 1427.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
82 | 0000000000000000000000076_002 | MET Speicher GmbH | Inactive | Storage unavailability | 2023-02-10 08:00:00 | 2023-03-17 08:00:00 | Planned | 2022-11-16 16:39:02 | GWh | 17.00000 | 1425.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
84 | 0000000000000000000000078_002 | MET Speicher GmbH | Inactive | Storage unavailability | 2023-03-17 08:00:00 | 2023-04-04 16:00:00 | Planned | 2022-11-16 16:40:51 | GWh | 32.00000 | 1410.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
86 | 0000000000000000000000080_002 | MET Speicher GmbH | Inactive | Storage unavailability | 2023-04-04 16:00:00 | 2023-05-09 16:00:00 | Planned | 2022-11-16 16:42:06 | GWh | 15.00000 | 1427.00000 | 1442.00000 | 37Y005053MH0000R | UGS Etzel-ESE MET | |
87 | 0000000000000000000000087_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-11-28 06:00:00 | 2022-11-30 06:00:00 | Planned | 2022-11-27 10:09:25 | GWh/d | 49.50000 | 0.00000 | 49.50000 | 37Y005053MH0000R | UGS Reckrod | |
88 | 0000000000000000000000088_001 | MET Speicher GmbH | Inactive | Withdrawal unavailability | 2022-12-06 06:00:00 | 2022-12-08 16:00:00 | Planned | 2022-12-05 14:34:56 | GWh/d | 49.50000 | 0.00000 | 49.50000 | 37Y005053MH0000R | UGS Reckrod | |
89 | 0000000000000000000000089_001 | MET Speicher GmbH | Inactive | Injection unavailability | 2023-02-28 18:00:00 | 2023-03-15 18:00:00 | Planned | 2023-02-28 10:40:36 | GWh/d | 24.74400 | 0.00000 | 24.74400 | 37Y005053MH0000R | UGS Reckrod |
ID | Message ID | Market Participant Name | Event Status | Type of Event | Event Start | Event Stop | Type of Unavailability | Publication date/time | Unit of Measurement | Unavailable Capacity | Available Capacity | Installed Capacity | Fuel Type | Bidding Zone | Affected Asset Name | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| ||||||||||||||
256 | 0000000000000000000000254_003 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-07-27 01:00:00 | 2024-07-31 18:00:00 | Unplanned | 2024-07-30 15:47:57 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
257 | 0000000000000000000000254_004 | Ineos oxide utilities NV | Inactive | Production unavailability | 2024-07-27 01:00:00 | 2024-07-30 18:00:00 | Unplanned | 2024-07-30 15:48:15 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
258 | 0000000000000000000000158_002 | Energie Wasser Bern | Dismissed | Production unavailability | 2025-08-10 07:00:00 | 2025-09-18 17:00:00 | Planned | 2024-10-15 10:12:08 | MW | 43.50000 | 0.00000 | 43.50000 | Fossil Gas | 10YCH-SWISSGRIDZ | GUD Energiezentrale Forsthaus | |
259 | 0000000000000000000000158_003 | Energie Wasser Bern | Active | Production unavailability | 2025-08-01 07:00:00 | 2025-09-30 17:00:00 | Planned | 2024-10-15 10:13:38 | MW | 43.50000 | 0.00000 | 43.50000 | Fossil Gas | 10YCH-SWISSGRIDZ | GUD Energiezentrale Forsthaus | |
260 | 0000000000000000000000260_001 | Energie Wasser Bern | Active | Production unavailability | 2026-08-01 07:00:00 | 2026-09-30 17:00:00 | Planned | 2024-10-15 10:56:58 | MW | 43.50000 | 0.00000 | 43.50000 | Fossil Gas | 10YCH-SWISSGRIDZ | GUD Energiezentrale Forsthaus | |
261 | 0000000000000000000000261_001 | Energie Wasser Bern | Active | Production unavailability | 2027-08-01 07:00:00 | 2027-09-30 17:00:00 | Planned | 2024-10-15 10:59:28 | MW | 43.50000 | 0.00000 | 43.50000 | Fossil Gas | 10YCH-SWISSGRIDZ | GUD Energiezentrale Forsthaus | |
262 | 0000000000000000000000262_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-10-18 21:20:00 | 2024-10-22 23:55:00 | Unplanned | 2024-10-18 19:23:34 | MW | 96.00000 | 43.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
263 | 0000000000000000000000263_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-10-18 21:20:00 | 2024-10-22 23:55:00 | Unplanned | 2024-10-18 19:23:35 | MW | 96.00000 | 43.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
264 | 0000000000000000000000263_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-10-18 21:20:00 | 2024-10-22 23:55:00 | Unplanned | 2024-10-19 05:32:26 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
265 | 0000000000000000000000262_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-10-18 21:20:00 | 2024-10-22 23:55:00 | Unplanned | 2024-10-19 11:10:38 | MW | 96.00000 | 43.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
266 | 0000000000000000000000263_003 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-10-18 21:20:00 | 2024-10-24 00:00:00 | Unplanned | 2024-10-21 09:57:59 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
267 | 0000000000000000000000263_004 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-10-18 21:20:00 | 2024-10-25 00:00:00 | Unplanned | 2024-10-22 07:53:36 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
268 | 0000000000000000000000263_005 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-10-18 21:20:00 | 2024-11-04 00:00:00 | Unplanned | 2024-10-22 09:13:21 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
269 | 0000000000000000000000269_001 | Ineos oxide utilities NV | Inactive | Production unavailability | 2024-10-30 10:30:00 | 2024-10-31 21:00:00 | Unplanned | 2024-10-30 09:03:28 | MW | 139.00000 | 0.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
270 | 0000000000000000000000270_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-10-31 21:00:00 | 2024-11-04 00:00:00 | Unplanned | 2024-10-30 09:08:02 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
271 | 0000000000000000000000263_006 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-10-18 21:20:00 | 2024-10-30 10:30:00 | Unplanned | 2024-10-30 09:09:18 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
272 | 0000000000000000000000263_007 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-10-18 21:20:00 | 2024-10-30 10:30:00 | Unplanned | 2024-10-30 09:36:10 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
273 | 0000000000000000000000270_002 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-10-31 21:00:00 | 2024-11-05 00:00:00 | Unplanned | 2024-11-04 15:10:07 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
274 | 0000000000000000000000270_003 | Ineos oxide utilities NV | Inactive | Production unavailability | 2024-10-31 21:00:00 | 2024-11-05 12:00:00 | Unplanned | 2024-11-04 16:02:21 | MW | 76.00000 | 63.00000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK | |
275 | 0000000000000000000000275_001 | Ineos oxide utilities NV | Dismissed | Production unavailability | 2024-11-08 12:00:00 | 2024-11-23 00:00:00 | Planned | 2024-11-05 14:54:41 | MW | 71.50000 | 71.50000 | 139.00000 | Fossil Gas | 10X1001A1001A094 | INESCO WKK |
ID | Message ID | Market Participant Name | Event Status | Event Start | Event Stop | Publication date/time | Remarks | |
---|---|---|---|---|---|---|---|---|
×
|
×
|
×
| ||||||
10 | 0000000000000000000000010_001 | Swissgrid AG | Inactive | 2020-12-21 00:00:00 | 2022-01-05 00:00:00 | 2021-12-23 09:12:31 | A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh. The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh. | |
11 | 0000000000000000000000011_001 | Swissgrid AG | Inactive | 2022-12-01 00:00:00 | 2023-05-15 23:55:00 | 2022-10-25 13:42:46 | Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html | |
12 | 0000000000000000000000012_001 | Swissgrid AG | Dismissed | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-13 15:04:43 | Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices. | |
13 | 0000000000000000000000013_001 | Swissgrid AG | Inactive | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-14 17:27:59 | UPDATE (reduced amount of energy) Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices. | |
14 | 0000000000000000000000012_002 | Swissgrid AG | Dismissed | 2024-02-20 04:00:00 | 2024-02-21 19:00:00 | 2024-02-14 17:40:34 | Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices. | |
15 | 0000000000000000000000015_001 | Swissgrid AG | Inactive | 2025-02-18 08:00:00 | 2025-02-18 10:00:00 | 2025-02-14 13:53:46 | Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with a thermal reserve power plant between 18/02/2025 08:00 and 18/02/2025 10:00. During this period, an excess of approx. 500 MWh will be fed into the grid, which may have an impact on prices. | |
16 | 0000000000000000000000016_001 | Swissgrid AG | Active | 2026-02-01 00:00:00 | 2026-05-15 23:55:00 | 2025-06-20 12:30:16 | Information about the Swiss hydropower reserve administrated by Swissgrid on behalf of the Swiss national regulator ElCom according to the Swiss Ordinance on the establishment of a hydropower reserve is available on the website of ElCom. Today ElCom fixed a total energy volume of 250 GWh for the coming winter period (01 February 2026 until 15 May 2026). See https://www.elcom.admin.ch/elcom/de/home/dokumentation/weisungen.html |