Showing 1-20 of 74 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityTechnical CapacityBalancing Zone 1Affected Asset Name
 
 
 
×
×
 
×
 
 
890000000000000000000000089_001MET Speicher GmbHInactiveInjection unavailability2023-02-28 18:00:002023-03-15 18:00:00Planned2023-02-28 10:40:36GWh/d24.744000.0000024.7440037Y005053MH0000RUGS Reckrod
880000000000000000000000088_001MET Speicher GmbHInactiveWithdrawal unavailability2022-12-06 06:00:002022-12-08 16:00:00Planned2022-12-05 14:34:56GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
870000000000000000000000087_001MET Speicher GmbHInactiveWithdrawal unavailability2022-11-28 06:00:002022-11-30 06:00:00Planned2022-11-27 10:09:25GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
860000000000000000000000080_002MET Speicher GmbHInactiveStorage unavailability2023-04-04 16:00:002023-05-09 16:00:00Planned2022-11-16 16:42:06GWh15.000001427.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
850000000000000000000000079_002MET Speicher GmbHInactiveWithdrawal unavailability2023-04-04 16:00:002023-05-09 16:00:00Planned2022-11-16 16:41:38kWh/h70000.000001845000.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
840000000000000000000000078_002MET Speicher GmbHInactiveStorage unavailability2023-03-17 08:00:002023-04-04 16:00:00Planned2022-11-16 16:40:51GWh32.000001410.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
830000000000000000000000077_002MET Speicher GmbHInactiveWithdrawal unavailability2023-03-17 08:00:002023-04-04 16:00:00Planned2022-11-16 16:40:32kWh/h155500.000001759500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
820000000000000000000000076_002MET Speicher GmbHInactiveStorage unavailability2023-02-10 08:00:002023-03-17 08:00:00Planned2022-11-16 16:39:02GWh17.000001425.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
810000000000000000000000075_002MET Speicher GmbHInactiveWithdrawal unavailability2023-02-10 08:00:002023-03-17 08:00:00Planned2022-11-16 16:37:23kWh/h85500.000001829500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
800000000000000000000000080_001MET Speicher GmbHDismissedStorage unavailability2023-04-04 16:00:002023-05-24 16:00:00Planned2022-11-11 15:56:34GWh15.000001427.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
790000000000000000000000079_001MET Speicher GmbHDismissedWithdrawal unavailability2023-04-04 16:00:002023-05-24 16:00:00Planned2022-11-11 15:56:21kWh/h70000.000001845000.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
780000000000000000000000078_001MET Speicher GmbHDismissedStorage unavailability2023-03-15 08:00:002023-04-04 16:00:00Planned2022-11-11 15:56:03GWh32.000001410.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
770000000000000000000000077_001MET Speicher GmbHDismissedWithdrawal unavailability2023-03-15 08:00:002023-04-04 16:00:00Planned2022-11-11 15:55:50kWh/h155500.000001759500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
760000000000000000000000076_001MET Speicher GmbHDismissedStorage unavailability2023-02-10 08:00:002023-03-15 08:00:00Planned2022-11-11 15:55:29GWh17.000001425.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
750000000000000000000000075_001MET Speicher GmbHDismissedWithdrawal unavailability2023-02-10 08:00:002023-03-15 08:00:00Planned2022-11-11 15:55:15kWh/h85500.000001829500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
740000000000000000000000074_001MET Speicher GmbHInactiveTransmission system unavailability2023-09-20 08:00:002023-09-20 18:00:00Planned2022-11-11 14:59:13kWh/h418977.000000.00000418977.0000021YNL----TTF---1UGS Etzel-ESE MET
730000000000000000000000048_003MET Speicher GmbHInactiveStorage unavailability2022-10-18 06:00:002022-11-04 06:00:00Planned2022-11-03 18:13:45GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
720000000000000000000000048_002MET Speicher GmbHDismissedStorage unavailability2022-10-18 06:00:002022-11-11 16:00:00Planned2022-10-13 06:22:49GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
710000000000000000000000058_002MET Speicher GmbHInactiveInjection unavailability2022-10-10 08:00:002022-12-16 16:00:00Planned2022-09-23 09:17:44kWh/h752000.000001505000.000002257000.0000037Y005053MH0000RUGS Etzel-ESE MET
700000000000000000000000038_004MET Speicher GmbHInactiveStorage unavailability2022-10-09 06:00:002022-10-15 18:00:00Planned2022-09-23 09:11:28GWh1442.000000.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
Showing 161-180 of 201 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityInstalled CapacityFuel TypeBidding ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
1200000000000000000000000118_003Ineos oxide utilities NVDismissedProduction unavailability2023-03-23 05:00:002023-03-24 18:00:00Unplanned2023-03-24 16:35:48MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1190000000000000000000000118_002Ineos oxide utilities NVDismissedProduction unavailability2023-03-23 05:00:002023-03-27 00:00:00Unplanned2023-03-23 09:57:49MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1180000000000000000000000118_001Ineos oxide utilities NVDismissedProduction unavailability2023-03-23 05:00:002023-03-24 06:00:00Unplanned2023-03-23 04:09:50MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1170000000000000000000000117_001Ineos oxide utilities NVInactiveProduction unavailability2023-03-23 02:45:002023-03-23 05:00:00Planned2023-03-23 02:29:13MW139.000000.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1160000000000000000000000116_001Ineos oxide utilities NVInactiveProduction unavailability2023-03-23 01:40:002023-03-23 05:00:00Unplanned2023-03-23 01:30:24MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1150000000000000000000000112_003Ineos oxide utilities NVDismissedProduction unavailability2023-03-17 20:00:002023-03-20 15:00:00Unplanned2023-03-20 14:01:22MW94.0000045.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1140000000000000000000000114_001Ineos oxide utilities NVInactiveProduction unavailability2023-03-20 15:00:002023-03-24 00:00:00Planned2023-03-20 14:09:30MW88.0000051.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1130000000000000000000000112_002Ineos oxide utilities NVDismissedProduction unavailability2023-03-17 20:00:002023-03-20 15:00:00Unplanned2023-03-20 13:56:12MW94.0000045.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1120000000000000000000000112_001Ineos oxide utilities NVDismissedProduction unavailability2023-03-17 20:00:002023-03-21 00:00:00Unplanned2023-03-17 20:17:01MW94.0000045.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1110000000000000000000000111_001Stadtwerke Rostock AGInactiveProduction unavailability2023-03-16 06:30:002023-03-17 23:55:00Planned2023-03-15 08:39:20MW36.0000072.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
1100000000000000000000000108_003Ineos oxide utilities NVDismissedProduction unavailability2023-03-09 20:00:002023-03-10 12:00:00Unplanned2023-03-10 10:00:18MW33.00000106.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1090000000000000000000000108_002Ineos oxide utilities NVDismissedProduction unavailability2023-03-09 20:00:002023-03-10 12:00:00Unplanned2023-03-10 09:58:07MW33.00000106.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1080000000000000000000000108_001Ineos oxide utilities NVDismissedProduction unavailability2023-03-09 20:00:002023-03-10 12:00:00Unplanned2023-03-09 19:08:04MW33.00000106.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1070000000000000000000000106_002Ineos oxide utilities NVDismissedProduction unavailability2023-02-12 22:35:002023-02-13 23:55:00Unplanned2023-02-13 08:26:34MW9.00000130.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1060000000000000000000000106_001Ineos oxide utilities NVDismissedProduction unavailability2023-02-12 22:35:002023-02-13 23:55:00Unplanned2023-02-12 21:26:46MW9.00000130.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1050000000000000000000000105_001Ineos oxide utilities NVInactiveProduction unavailability2023-02-05 12:15:002023-02-07 00:00:00Unplanned2023-02-05 11:21:51MW0.00000139.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1040000000000000000000000104_001Ineos oxide utilities NVInactiveProduction unavailability2023-10-02 00:00:002023-10-28 00:00:00Planned2023-01-30 10:00:55MW46.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1030000000000000000000000103_001Ineos oxide utilities NVInactiveProduction unavailability2023-09-04 00:00:002023-09-23 00:00:00Planned2023-01-30 09:59:15MW46.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1020000000000000000000000102_001Ineos oxide utilities NVInactiveProduction unavailability2023-08-28 00:00:002023-11-07 00:00:00Planned2023-01-30 09:43:50MW50.0000089.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1010000000000000000000000101_001Stadtwerke Rostock AGInactiveProduction unavailability2022-10-04 14:00:002022-10-14 23:55:00Unplanned2022-10-04 12:33:40MW36.0000072.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
Showing 1-5 of 5 items.
 IDMessage IDMarket Participant NameEvent StatusEvent StartEvent StopPublication date/timeRemarks
 
 
×
×
×
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.

The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh.