Showing 21-40 of 75 items.
 IDMessage IDMp NameEvent StatusType of EventEvent Start (UTC)Event Stop (UTC)Type of UnavailabilityPublication date/time (UTC)Unit of MeasurementUnavailable CapacityAvailable CapacityTechnical CapacityBalancing ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
700000000000000000000000038_004MET Speicher GmbHInactiveStorage unavailability2022-10-09 06:00:002022-10-15 18:00:00Planned2022-09-23 09:11:28GWh1442.000000.000001442.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
690000000000000000000000038_003MET Speicher GmbHDismissedStorage unavailability2022-10-09 06:00:002022-10-17 18:00:00Planned2022-05-27 07:27:36GWh1485.000000.000001485.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
680000000000000000000000068_001MET Speicher GmbHInactiveInjection unavailability2022-05-23 06:00:002022-05-24 06:00:00Planned2022-05-20 07:18:54kWh/h639.00000333.00000972.0000037Y005053MH0000RUGS Reckrod
670000000000000000000000064_002MET Speicher GmbHInactiveInjection unavailability2022-05-19 06:00:002022-05-21 06:00:00Planned2022-05-19 14:09:03kWh/h491000.00000483000.00000974000.0000037Y005053MH0000RUGS Reckrod
660000000000000000000000060_002MET Speicher GmbHDismissedInjection unavailability2022-09-27 06:00:002022-10-18 14:00:00Planned2022-05-19 14:04:59kWh/h127737.00000127737.00000255474.0000021YNL----TTF---1UGS Etzel-ESE MET
650000000000000000000000059_002MET Speicher GmbHDismissedWithdrawal unavailability2022-09-27 06:00:002022-10-18 14:00:00Planned2022-05-19 14:04:13kWh/h209488.00000209489.00000418977.0000021YNL----TTF---1UGS Etzel-ESE MET
640000000000000000000000064_001MET Speicher GmbHDismissedInjection unavailability2022-05-19 06:00:002022-05-20 06:00:00Planned2022-05-18 13:23:03kWh/h491000.00000483000.00000974000.0000037Y005053MH0000RUGS Reckrod
630000000000000000000000063_001MET Speicher GmbHInactiveInjection unavailability2022-05-18 14:00:002022-05-19 06:00:00Planned2022-05-17 14:15:59kWh/h479000.00000500000.00000979000.0000037Y005053MH0000RUGS Reckrod
620000000000000000000000062_001MET Speicher GmbHInactiveInjection unavailability2022-05-18 06:00:002022-05-18 14:00:00Planned2022-05-17 14:14:20kWh/h979000.000000.00000979000.0000037Y005053MH0000RUGS Reckrod
610000000000000000000000057_002MET Speicher GmbHInactiveInjection unavailability2022-05-17 00:00:002022-05-18 06:00:00Planned2022-05-17 14:12:06kWh/h754000.00000225000.00000979000.0000037Y005053MH0000RUGS Reckrod
600000000000000000000000060_001MET Speicher GmbHDismissedInjection unavailability2022-09-27 06:00:002022-10-18 14:00:00Planned2022-05-16 15:32:43kWh/h127737.00000127737.00000255474.0000021YNL----TTF---1UGS Etzel-ESE MET
590000000000000000000000059_001MET Speicher GmbHDismissedWithdrawal unavailability2022-09-27 06:00:002022-10-18 14:00:00Planned2022-05-16 15:30:18kWh/h209488.00000209489.00000418977.0000021YNL----TTF---1UGS Etzel-ESE MET
580000000000000000000000058_001MET Speicher GmbHDismissedInjection unavailability2022-10-10 08:00:002022-12-16 16:00:00Planned2022-05-16 15:08:19kWh/h640000.000001275000.000001915000.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
570000000000000000000000057_001MET Speicher GmbHDismissedInjection unavailability2022-05-17 00:00:002022-05-18 00:00:00Planned2022-05-16 10:15:11kWh/h754000.00000225000.00000979000.0000037Y005053MH0000RUGS Reckrod
560000000000000000000000038_002MET Speicher GmbHDismissedStorage unavailability2022-10-07 06:00:002022-10-15 18:00:00Planned2022-05-16 07:16:06GWh1485.000000.000001485.0000037Y005053MH0000R, 21YNL----TTF---1UGS Etzel-ESE MET
550000000000000000000000055_001MET Speicher GmbHInactiveInjection unavailability2022-05-16 00:00:002022-05-17 00:00:00Planned2022-05-13 12:49:10kWh/h679000.00000300000.00000979000.0000037Y005053MH0000RUGS Reckrod
540000000000000000000000051_004MET Speicher GmbHInactiveInjection unavailability2022-05-13 00:00:002022-05-16 00:00:00Planned2022-05-13 12:45:08kWh/h529000.00000450000.00000979000.0000037Y005053MH0000RUGS Reckrod
530000000000000000000000051_003MET Speicher GmbHDismissedInjection unavailability2022-05-13 00:00:002022-05-14 00:00:00Planned2022-05-12 13:09:45kWh/h529000.00000450000.00000979000.0000037Y005053MH0000RUGS Reckrod
520000000000000000000000051_002MET Speicher GmbHDismissedInjection unavailability2022-05-13 08:00:002022-05-13 16:00:00Planned2022-05-12 13:07:50kWh/h979000.000000.00000979000.0000037Y005053MH0000RUGS Reckrod
510000000000000000000000051_001MET Speicher GmbHDismissedInjection unavailability2022-05-13 08:00:002022-05-13 16:00:00Planned2022-05-12 13:04:05kWh/h979000.000000.00000979000.0000037Y005053MH0000RUGS Reckrod
Showing 181-200 of 343 items.
 IDMessage IDMp NameEvent StatusType of EventEvent Start (UTC)Event Stop (UTC)Type of UnavailabilityPublication date/time (UTC)Unit of MeasurementInstalled CapacityFuel TypeBidding ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
 
2430000000000000000000000243_001Ineos oxide utilities NVDismissedProduction unavailability2024-06-28 05:00:002024-07-02 00:00:00Planned2024-06-28 14:50:24MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2420000000000000000000000237_006Ineos oxide utilities NVDismissedProduction unavailability2024-06-26 18:15:002024-06-28 18:00:00Unplanned2024-06-27 13:01:44MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2410000000000000000000000237_005Ineos oxide utilities NVDismissedProduction unavailability2024-06-26 18:15:002024-06-27 12:00:00Unplanned2024-06-27 12:59:54MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2400000000000000000000000237_004Ineos oxide utilities NVDismissedProduction unavailability2024-06-26 18:15:002024-06-27 12:00:00Unplanned2024-06-27 12:58:09MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2390000000000000000000000237_003Ineos oxide utilities NVDismissedProduction unavailability2024-06-26 18:15:002024-06-27 12:00:00Unplanned2024-06-27 09:48:28MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2380000000000000000000000237_002Ineos oxide utilities NVDismissedProduction unavailability2024-06-26 18:15:002024-06-27 12:00:00Unplanned2024-06-26 17:56:43MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2370000000000000000000000237_001Ineos oxide utilities NVDismissedProduction unavailability2024-06-26 18:15:002024-06-26 21:00:00Unplanned2024-06-26 17:13:06MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2360000000000000000000000236_001Ineos oxide utilities NVInactiveProduction unavailability2024-06-24 16:35:002024-06-25 10:00:00Unplanned2024-06-24 16:19:11MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2350000000000000000000000235_001Ineos oxide utilities NVInactiveProduction unavailability2024-06-19 09:25:002024-06-19 13:25:00Unplanned2024-06-19 07:49:47MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2340000000000000000000000231_004Ineos oxide utilities NVInactiveProduction unavailability2024-06-07 21:30:002024-06-14 19:00:00Unplanned2024-06-14 17:43:23MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2330000000000000000000000231_003Ineos oxide utilities NVDismissedProduction unavailability2024-06-07 21:30:002024-06-15 00:00:00Unplanned2024-06-10 08:14:16MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2320000000000000000000000231_002Ineos oxide utilities NVDismissedProduction unavailability2024-06-07 21:30:002024-06-11 00:00:00Unplanned2024-06-08 13:46:09MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2310000000000000000000000231_001Ineos oxide utilities NVDismissedProduction unavailability2024-06-07 21:30:002024-06-11 00:00:00Unplanned2024-06-07 19:45:31MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2300000000000000000000000229_002Ineos oxide utilities NVInactiveProduction unavailability2024-06-03 20:00:002024-06-07 15:00:00Unplanned2024-06-07 11:35:34MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2290000000000000000000000229_001Ineos oxide utilities NVDismissedProduction unavailability2024-06-03 20:00:002024-06-08 00:00:00Unplanned2024-06-03 14:04:55MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2280000000000000000000000226_003Ineos oxide utilities NVInactiveProduction unavailability2024-05-20 20:00:002024-05-23 18:00:00Planned2024-05-23 16:02:01MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2270000000000000000000000226_002Ineos oxide utilities NVDismissedProduction unavailability2024-05-20 20:00:002024-05-25 00:00:00Planned2024-05-17 10:26:09MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2260000000000000000000000226_001Ineos oxide utilities NVDismissedProduction unavailability2024-05-20 00:00:002024-05-25 00:00:00Planned2024-05-13 08:23:54MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2250000000000000000000000224_002Ineos oxide utilities NVInactiveProduction unavailability2024-04-03 12:30:002024-04-03 15:00:00Unplanned2024-04-03 13:27:12MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
2240000000000000000000000224_001Ineos oxide utilities NVDismissedProduction unavailability2024-04-03 12:30:002024-04-03 16:30:00Unplanned2024-04-03 11:25:02MW139.00000Fossil Gas10X1001A1001A094INESCO WKK
Showing 1-10 of 10 items.
 IDMessage IDMp NameEvent StatusEvent Start (UTC)Event Stop (UTC)Publication date/time (UTC)Remarks
 
 
×
×
×
210000000000000000000000019_002Swissgrid AGInactive2026-06-24 09:00:002026-06-24 14:00:002026-06-24 14:30:02Please be informed that on Wednesday, 24 June 2026, from 09:00 CEST to 14:00 CEST, Swissgrid experienced an internal issue that disrupted data delivery processes to the Transparency Platform. As a result, all data items scheduled for submission during this period were affected.
Swissgrid is currently working to restore normal data delivery and to backfill the affected data.
We apologize for any inconvenience this may have caused and appreciate your understanding.
190000000000000000000000019_001Swissgrid AGActive2026-06-24 09:00:002026-06-24 14:00:002026-06-24 14:23:23Please be informed that on Wednesday, 24 June 2026, from 09:00 CEST to 14:00 CEST, Swissgrid experienced an internal issue that disrupted data delivery processes to the Transparency Platform. As a result, all data items scheduled for submission during this period were affected.
Swissgrid is currently working to restore normal data delivery and to backfill the affected data.
We apologize for any inconvenience this may have caused and appreciate your understanding.
180000000000000000000000018_001MET International AGActive2025-07-17 00:00:00(not set)2025-07-29 15:55:33MET International AG's regasification capacity is available due to termination of the TUA by MET International AG pursuant to its terms.
160000000000000000000000016_001Swissgrid AGInactive2026-02-01 00:00:002026-05-15 23:55:002025-06-20 12:30:16Information about the Swiss hydropower reserve administrated by Swissgrid on behalf of the Swiss national regulator ElCom according to the Swiss Ordinance on the establishment of a hydropower reserve is available on the website of ElCom. Today ElCom fixed a total energy volume of 250 GWh for the coming winter period (01 February 2026 until 15 May 2026). See https://www.elcom.admin.ch/elcom/de/home/dokumentation/weisungen.html
150000000000000000000000015_001Swissgrid AGInactive2025-02-18 08:00:002025-02-18 10:00:002025-02-14 13:53:46Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with a thermal reserve power plant between 18/02/2025 08:00 and 18/02/2025 10:00. During this period, an excess of approx. 500 MWh will be fed into the grid, which may have an impact on prices.
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.

The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh.