Showing 41-60 of 74 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityTechnical CapacityBalancing Zone 1Affected Asset Name
 
 
 
×
×
 
×
 
 
630000000000000000000000063_001MET Speicher GmbHInactiveInjection unavailability2022-05-18 14:00:002022-05-19 06:00:00Planned2022-05-17 14:15:59kWh/h479000.00000500000.00000979000.0000037Y005053MH0000RUGS Reckrod
620000000000000000000000062_001MET Speicher GmbHInactiveInjection unavailability2022-05-18 06:00:002022-05-18 14:00:00Planned2022-05-17 14:14:20kWh/h979000.000000.00000979000.0000037Y005053MH0000RUGS Reckrod
570000000000000000000000057_001MET Speicher GmbHDismissedInjection unavailability2022-05-17 00:00:002022-05-18 00:00:00Planned2022-05-16 10:15:11kWh/h754000.00000225000.00000979000.0000037Y005053MH0000RUGS Reckrod
610000000000000000000000057_002MET Speicher GmbHInactiveInjection unavailability2022-05-17 00:00:002022-05-18 06:00:00Planned2022-05-17 14:12:06kWh/h754000.00000225000.00000979000.0000037Y005053MH0000RUGS Reckrod
550000000000000000000000055_001MET Speicher GmbHInactiveInjection unavailability2022-05-16 00:00:002022-05-17 00:00:00Planned2022-05-13 12:49:10kWh/h679000.00000300000.00000979000.0000037Y005053MH0000RUGS Reckrod
510000000000000000000000051_001MET Speicher GmbHDismissedInjection unavailability2022-05-13 08:00:002022-05-13 16:00:00Planned2022-05-12 13:04:05kWh/h979000.000000.00000979000.0000037Y005053MH0000RUGS Reckrod
520000000000000000000000051_002MET Speicher GmbHDismissedInjection unavailability2022-05-13 08:00:002022-05-13 16:00:00Planned2022-05-12 13:07:50kWh/h979000.000000.00000979000.0000037Y005053MH0000RUGS Reckrod
530000000000000000000000051_003MET Speicher GmbHDismissedInjection unavailability2022-05-13 00:00:002022-05-14 00:00:00Planned2022-05-12 13:09:45kWh/h529000.00000450000.00000979000.0000037Y005053MH0000RUGS Reckrod
540000000000000000000000051_004MET Speicher GmbHInactiveInjection unavailability2022-05-13 00:00:002022-05-16 00:00:00Planned2022-05-13 12:45:08kWh/h529000.00000450000.00000979000.0000037Y005053MH0000RUGS Reckrod
410000000000000000000000041_001MET Speicher GmbHInactiveWithdrawal unavailability2022-03-23 06:00:002022-03-24 18:00:00Planned2022-03-17 08:23:25kWh/h2063000.000000.000002063000.0000037Y005053MH0000RUGS Reckrod
420000000000000000000000042_001MET Speicher GmbHInactiveInjection unavailability2022-03-23 06:00:002022-03-24 18:00:00Planned2022-03-17 08:23:50kWh/h957000.00000170000.000001127000.0000037Y005053MH0000RUGS Reckrod
350000000000000000000000035_001MET Speicher GmbHDismissedStorage unavailability2022-03-17 18:00:002022-05-13 16:00:00Planned2022-01-03 16:53:00GWh11.756001473.244001485.0000037Y005053MH0000RUGS Etzel-ESE MET
360000000000000000000000036_001MET Speicher GmbHDismissedWithdrawal unavailability2022-03-17 18:00:002022-05-13 16:00:00Planned2022-01-03 16:53:15kWh/h95750.000001819250.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
490000000000000000000000035_002MET Speicher GmbHInactiveStorage unavailability2022-03-17 18:00:002022-05-20 16:00:00Planned2022-04-28 13:06:39GWh11.756001473.244001485.0000037Y005053MH0000RUGS Etzel-ESE MET
500000000000000000000000036_002MET Speicher GmbHInactiveWithdrawal unavailability2022-03-17 18:00:002022-05-20 16:00:00Planned2022-04-28 13:07:34kWh/h95750.000001819250.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
330000000000000000000000033_001MET Speicher GmbHInactiveInjection unavailability2022-01-17 08:00:002022-03-25 16:00:00Planned2022-01-03 16:52:30kWh/h750750.000001524250.000002275000.0000037Y005053MH0000RUGS Etzel-ESE MET
340000000000000000000000034_001MET Speicher GmbHInactiveWithdrawal unavailability2022-01-17 08:00:002022-03-25 16:00:00Planned2022-01-03 16:52:47kWh/h631950.000001283050.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
320000000000000000000000032_001MET Speicher GmbHInactiveInjection unavailability2022-01-03 08:00:002022-01-16 16:00:00Planned2022-01-03 16:51:54kWh/h750750.000001524250.000002275000.0000037Y005053MH0000RUGS Etzel-ESE MET
220000000000000000000000022_001astora GmbH and Co. KGDismissedInjection unavailability2021-10-26 16:00:002021-11-17 22:00:00Planned2021-05-28 08:06:38KWh/h3099249.000001033083.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
240000000000000000000000022_002astora GmbH and Co. KGInactiveInjection unavailability2021-10-26 16:00:002021-11-17 22:00:00Planned2021-05-28 08:18:49KWh/h1033083.000003099249.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
Showing 1-20 of 145 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityInstalled CapacityFuel TypeBidding ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
1580000000000000000000000158_001Energie Wasser BernActiveProduction unavailability2025-08-10 07:00:002025-09-18 17:00:00Planned2023-06-19 05:53:02MW43.500000.0000043.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
1570000000000000000000000157_001Energie Wasser BernActiveProduction unavailability2024-09-08 07:00:002024-09-19 17:00:00Planned2023-06-19 05:50:06MW43.500000.0000043.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
2240000000000000000000000224_001Ineos oxide utilities NVDismissedProduction unavailability2024-04-03 12:30:002024-04-03 16:30:00Unplanned2024-04-03 11:25:02MW50.0000089.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2250000000000000000000000224_002Ineos oxide utilities NVInactiveProduction unavailability2024-04-03 12:30:002024-04-03 15:00:00Unplanned2024-04-03 13:27:12MW50.0000089.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2220000000000000000000000222_001Ineos oxide utilities NVDismissedProduction unavailability2024-02-08 20:15:002024-02-10 00:00:00Unplanned2024-02-08 19:18:16MW25.00000114.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2230000000000000000000000222_002Ineos oxide utilities NVInactiveProduction unavailability2024-02-08 20:15:002024-02-09 14:30:00Unplanned2024-02-09 13:32:23MW25.00000114.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2170000000000000000000000217_001Ineos oxide utilities NVDismissedProduction unavailability2024-01-25 18:00:002024-01-27 00:00:00Unplanned2024-01-25 18:06:05MW10.00000129.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2180000000000000000000000217_002Ineos oxide utilities NVDismissedProduction unavailability2024-01-25 18:00:002024-01-27 00:00:00Unplanned2024-01-25 18:07:12MW10.00000129.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2190000000000000000000000217_003Ineos oxide utilities NVDismissedProduction unavailability2024-01-25 18:00:002024-01-11 00:40:00Unplanned2024-01-26 10:41:02MW10.00000129.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2200000000000000000000000217_004Ineos oxide utilities NVDismissedProduction unavailability2024-01-25 18:00:002024-01-11 00:40:00Unplanned2024-01-27 07:34:16MW10.00000129.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2210000000000000000000000217_005Ineos oxide utilities NVDismissedProduction unavailability2024-01-25 18:00:002024-01-26 11:40:00Unplanned2024-01-27 07:35:09MW10.00000129.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2130000000000000000000000213_001Ineos oxide utilities NVDismissedProduction unavailability2024-01-21 12:00:002024-01-25 00:00:00Planned2024-01-12 13:44:51MW71.5000067.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2150000000000000000000000213_002Ineos oxide utilities NVDismissedProduction unavailability2024-01-21 12:00:002024-01-26 00:00:00Planned2024-01-23 09:31:26MW71.5000067.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2160000000000000000000000213_003Ineos oxide utilities NVInactiveProduction unavailability2024-01-21 12:00:002024-01-25 18:00:00Planned2024-01-25 18:04:24MW71.5000067.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2090000000000000000000000203_002Ineos oxide utilities NVDismissedProduction unavailability2024-01-17 00:00:002024-01-19 00:00:00Planned2024-01-09 10:04:18MW50.0000089.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2140000000000000000000000203_003Ineos oxide utilities NVInactiveProduction unavailability2024-01-17 00:00:002024-01-18 14:50:00Planned2024-01-18 13:45:54MW50.0000089.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2030000000000000000000000203_001Ineos oxide utilities NVDismissedProduction unavailability2024-01-10 00:00:002024-01-12 00:00:00Planned2024-01-05 07:43:09MW50.0000089.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2040000000000000000000000204_001Ineos oxide utilities NVDismissedProduction unavailability2024-01-08 01:10:002024-01-08 10:00:00Unplanned2024-01-08 03:36:14MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2050000000000000000000000204_002Ineos oxide utilities NVDismissedProduction unavailability2024-01-08 01:10:002024-01-08 18:00:00Unplanned2024-01-08 08:14:01MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2060000000000000000000000204_003Ineos oxide utilities NVDismissedProduction unavailability2024-01-08 01:10:002024-01-09 12:00:00Unplanned2024-01-08 16:21:17MW96.0000043.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
Showing 1-5 of 5 items.
 IDMessage IDMarket Participant NameEvent StatusEvent StartEvent StopPublication date/timeRemarks
 
 
×
×
×
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.

The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh.