 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityTechnical CapacityBalancing Zone 1Affected Asset Name
 
 
 
×
×
 
×
 
 
890000000000000000000000089_001MET Speicher GmbHInactiveInjection unavailability2023-02-28 18:00:002023-03-15 18:00:00Planned2023-02-28 10:40:36GWh/d24.744000.0000024.7440037Y005053MH0000RUGS Reckrod
880000000000000000000000088_001MET Speicher GmbHInactiveWithdrawal unavailability2022-12-06 06:00:002022-12-08 16:00:00Planned2022-12-05 14:34:56GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
870000000000000000000000087_001MET Speicher GmbHInactiveWithdrawal unavailability2022-11-28 06:00:002022-11-30 06:00:00Planned2022-11-27 10:09:25GWh/d49.500000.0000049.5000037Y005053MH0000RUGS Reckrod
860000000000000000000000080_002MET Speicher GmbHInactiveStorage unavailability2023-04-04 16:00:002023-05-09 16:00:00Planned2022-11-16 16:42:06GWh15.000001427.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
850000000000000000000000079_002MET Speicher GmbHInactiveWithdrawal unavailability2023-04-04 16:00:002023-05-09 16:00:00Planned2022-11-16 16:41:38kWh/h70000.000001845000.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
840000000000000000000000078_002MET Speicher GmbHInactiveStorage unavailability2023-03-17 08:00:002023-04-04 16:00:00Planned2022-11-16 16:40:51GWh32.000001410.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
830000000000000000000000077_002MET Speicher GmbHInactiveWithdrawal unavailability2023-03-17 08:00:002023-04-04 16:00:00Planned2022-11-16 16:40:32kWh/h155500.000001759500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
820000000000000000000000076_002MET Speicher GmbHInactiveStorage unavailability2023-02-10 08:00:002023-03-17 08:00:00Planned2022-11-16 16:39:02GWh17.000001425.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
810000000000000000000000075_002MET Speicher GmbHInactiveWithdrawal unavailability2023-02-10 08:00:002023-03-17 08:00:00Planned2022-11-16 16:37:23kWh/h85500.000001829500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
800000000000000000000000080_001MET Speicher GmbHDismissedStorage unavailability2023-04-04 16:00:002023-05-24 16:00:00Planned2022-11-11 15:56:34GWh15.000001427.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
790000000000000000000000079_001MET Speicher GmbHDismissedWithdrawal unavailability2023-04-04 16:00:002023-05-24 16:00:00Planned2022-11-11 15:56:21kWh/h70000.000001845000.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
780000000000000000000000078_001MET Speicher GmbHDismissedStorage unavailability2023-03-15 08:00:002023-04-04 16:00:00Planned2022-11-11 15:56:03GWh32.000001410.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
770000000000000000000000077_001MET Speicher GmbHDismissedWithdrawal unavailability2023-03-15 08:00:002023-04-04 16:00:00Planned2022-11-11 15:55:50kWh/h155500.000001759500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
760000000000000000000000076_001MET Speicher GmbHDismissedStorage unavailability2023-02-10 08:00:002023-03-15 08:00:00Planned2022-11-11 15:55:29GWh17.000001425.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
750000000000000000000000075_001MET Speicher GmbHDismissedWithdrawal unavailability2023-02-10 08:00:002023-03-15 08:00:00Planned2022-11-11 15:55:15kWh/h85500.000001829500.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
740000000000000000000000074_001MET Speicher GmbHInactiveTransmission system unavailability2023-09-20 08:00:002023-09-20 18:00:00Planned2022-11-11 14:59:13kWh/h418977.000000.00000418977.0000021YNL----TTF---1UGS Etzel-ESE MET
730000000000000000000000048_003MET Speicher GmbHInactiveStorage unavailability2022-10-18 06:00:002022-11-04 06:00:00Planned2022-11-03 18:13:45GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
720000000000000000000000048_002MET Speicher GmbHDismissedStorage unavailability2022-10-18 06:00:002022-11-11 16:00:00Planned2022-10-13 06:22:49GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
710000000000000000000000058_002MET Speicher GmbHInactiveInjection unavailability2022-10-10 08:00:002022-12-16 16:00:00Planned2022-09-23 09:17:44kWh/h752000.000001505000.000002257000.0000037Y005053MH0000RUGS Etzel-ESE MET
700000000000000000000000038_004MET Speicher GmbHInactiveStorage unavailability2022-10-09 06:00:002022-10-15 18:00:00Planned2022-09-23 09:11:28GWh1442.000000.000001442.0000037Y005053MH0000RUGS Etzel-ESE MET
Showing 181-200 of 201 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityInstalled CapacityFuel TypeBidding ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
1000000000000000000000000100_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-11-10 10:00:002022-11-10 14:00:00Planned2022-09-20 09:05:04MW6.800000.000007.50000Solar10XRO-TEL------2CEF Stanesti
990000000000000000000000099_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-11-09 10:00:002022-11-09 16:00:00Planned2022-09-20 09:00:13MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
980000000000000000000000098_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-11-08 10:00:002022-11-08 16:00:00Planned2022-09-20 08:57:20MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
970000000000000000000000097_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-11-07 10:00:002022-11-07 16:00:00Planned2022-09-20 08:51:32MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
950000000000000000000000095_001Stadtwerke Rostock AGInactiveProduction unavailability2022-06-10 00:00:002022-06-20 23:55:00Planned2022-06-09 05:36:11MW108.000000.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
930000000000000000000000093_001Stadtwerke Rostock AGInactiveProduction unavailability2022-05-28 00:00:002022-06-20 23:55:00Planned2022-05-20 05:42:18MW36.0000072.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
920000000000000000000000092_001Stadtwerke Rostock AGInactiveProduction unavailability2022-04-18 00:00:002022-05-27 23:55:00Planned2022-04-19 12:24:57MW36.0000072.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
910000000000000000000000091_001Stadtwerke Rostock AGInactiveProduction unavailability2022-04-18 00:00:002022-05-27 23:55:00Planned2022-04-19 12:16:35MW36.0000072.0000036.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
900000000000000000000000090_001Energie Wasser BernInactiveProduction unavailability2022-09-05 07:00:002022-09-23 17:00:00Planned2022-02-08 08:38:49MW43.500000.0000043.50000Fossil Gas10YCH-SWISSGRIDZGUD Energiezentrale Forsthaus
890000000000000000000000089_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2022-02-01 08:00:002022-02-01 16:00:00Planned2022-01-27 11:55:01MW6.800000.000007.50000Solar10YRO-TEL------PCEF Stanesti
880000000000000000000000088_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2021-12-16 10:00:002021-12-16 14:00:00Planned2021-12-03 11:42:26MW6.800000.000007.50000Solar10YRO-TEL------PCEF Stanesti
870000000000000000000000087_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2021-12-15 10:00:002021-12-15 16:00:00Planned2021-12-03 11:39:52MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
860000000000000000000000086_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2021-12-14 10:00:002021-12-16 16:00:00Planned2021-12-03 11:37:12MW2.380004.420007.50000Solar10YRO-TEL------PCEF Stanesti
850000000000000000000000085_001Electrica Energie Verde 1 SRLInactiveProduction unavailability2021-12-13 10:00:002021-12-13 16:00:00Planned2021-12-03 11:32:56MW2.264404.535607.50000Solar10YRO-TEL------PCEF Stanesti
840000000000000000000000079_002Electrica Energie Verde 1 SRLDismissedProduction unavailability2022-04-28 08:00:002022-04-28 09:00:00Planned2021-07-26 06:15:51MW1.200005.600007.50000Solar10YRO-TEL------PCEF Stanesti
830000000000000000000000078_002Electrica Energie Verde 1 SRLDismissedProduction unavailability2022-04-27 08:00:002022-04-27 09:00:00Planned2021-07-23 11:07:35MW1.200005.600007.50000Solar10YRO-TEL------PCEF Stanesti
800000000000000000000000080_001Stadtwerke Rostock AGInactiveProduction unavailability2021-06-09 00:00:002021-08-01 00:00:00Planned2021-07-15 10:08:48MW108.000000.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
790000000000000000000000079_001Electrica Energie Verde 1 SRLDismissedProduction unavailability2022-04-28 08:00:002022-04-28 09:00:00Planned2021-07-13 09:42:02MW1.200005.600007.50000Solar10YRO-TEL------PCEF Stanesti
780000000000000000000000078_001Electrica Energie Verde 1 SRLDismissedProduction unavailability2022-04-27 08:00:002022-04-27 09:00:00Planned2021-07-13 09:38:38MW1.200005.600007.50000Solar10YRO-TEL------PCEF Stanesti
770000000000000000000000077_001Energieversorgung Schwerin GmbH und Co. Erzeugung KGInactiveProduction unavailability2021-05-01 00:00:002023-04-01 00:00:00Planned2021-07-08 09:16:19MW40.000000.0000040.00000Fossil Gas10YDE-VE-------2HKW Süd
Showing 1-5 of 5 items.
 IDMessage IDMarket Participant NameEvent StatusEvent StartEvent StopPublication date/timeRemarks
 
 
×
×
×
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.

The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh.