Showing 1-20 of 74 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityTechnical CapacityBalancing Zone 1Affected Asset Name
 
 
 
×
×
 
×
 
 
160000000000000000000000016_001astora GmbH and Co. KGDismissedInjection unavailability2020-10-05 06:00:002020-10-17 18:00:00Planned2020-06-10 09:31:00KWh/h14365000.000000.0000014365000.0000037Z0000000052293Rehden natural gas storage facility
180000000000000000000000018_001astora GmbH and Co. KGDismissedWithdrawal unavailability2020-10-05 06:00:002020-10-17 18:00:00Planned2020-06-10 09:51:11KWh/h22100000.000000.0000022100000.0000037Z0000000052293Rehden natural gas storage facility
190000000000000000000000018_002astora GmbH and Co. KGDismissedWithdrawal unavailability2020-10-05 06:00:002020-10-17 18:00:00Planned2020-06-10 09:57:00KWh/h22100000.000000.0000022100000.0000037Z0000000052293Rehden natural gas storage facility
220000000000000000000000022_001astora GmbH and Co. KGDismissedInjection unavailability2021-10-26 16:00:002021-11-17 22:00:00Planned2021-05-28 08:06:38KWh/h3099249.000001033083.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
250000000000000000000000025_001astora GmbH and Co. KGDismissedOffshore pipeline unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-05-29 06:17:08KWh/h4132332.000000.000004132332.0000037Y701133MH0000PUGS Haidach - Astora - Injection
270000000000000000000000027_001astora GmbH and Co. KGDismissedWithdrawal unavailability2021-10-04 07:00:002021-10-19 16:00:00Planned2021-05-30 15:20:09KWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
280000000000000000000000027_002astora GmbH and Co. KGDismissedWithdrawal unavailability2021-10-04 07:00:002021-10-19 16:05:00Planned2021-06-01 06:06:56KWh/h4357733.000000.000004357733.0000037Y701133MH0000PUGS Haidach - Astora - Withdrawal
350000000000000000000000035_001MET Speicher GmbHDismissedStorage unavailability2022-03-17 18:00:002022-05-13 16:00:00Planned2022-01-03 16:53:00GWh11.756001473.244001485.0000037Y005053MH0000RUGS Etzel-ESE MET
360000000000000000000000036_001MET Speicher GmbHDismissedWithdrawal unavailability2022-03-17 18:00:002022-05-13 16:00:00Planned2022-01-03 16:53:15kWh/h95750.000001819250.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
380000000000000000000000038_001MET Speicher GmbHDismissedStorage unavailability2022-10-09 06:00:002022-10-15 18:00:00Planned2022-01-03 16:53:35GWh1485.000000.000001485.0000037Y005053MH0000RUGS Etzel-ESE MET
480000000000000000000000048_001MET Speicher GmbHDismissedStorage unavailability2022-10-17 06:00:002022-11-11 16:00:00Planned2022-04-25 15:23:18GWh1461.000000.000001461.0000037Y005053MH0000RUGS Reckrod
510000000000000000000000051_001MET Speicher GmbHDismissedInjection unavailability2022-05-13 08:00:002022-05-13 16:00:00Planned2022-05-12 13:04:05kWh/h979000.000000.00000979000.0000037Y005053MH0000RUGS Reckrod
520000000000000000000000051_002MET Speicher GmbHDismissedInjection unavailability2022-05-13 08:00:002022-05-13 16:00:00Planned2022-05-12 13:07:50kWh/h979000.000000.00000979000.0000037Y005053MH0000RUGS Reckrod
530000000000000000000000051_003MET Speicher GmbHDismissedInjection unavailability2022-05-13 00:00:002022-05-14 00:00:00Planned2022-05-12 13:09:45kWh/h529000.00000450000.00000979000.0000037Y005053MH0000RUGS Reckrod
560000000000000000000000038_002MET Speicher GmbHDismissedStorage unavailability2022-10-07 06:00:002022-10-15 18:00:00Planned2022-05-16 07:16:06GWh1485.000000.000001485.0000037Y005053MH0000RUGS Etzel-ESE MET
570000000000000000000000057_001MET Speicher GmbHDismissedInjection unavailability2022-05-17 00:00:002022-05-18 00:00:00Planned2022-05-16 10:15:11kWh/h754000.00000225000.00000979000.0000037Y005053MH0000RUGS Reckrod
580000000000000000000000058_001MET Speicher GmbHDismissedInjection unavailability2022-10-10 08:00:002022-12-16 16:00:00Planned2022-05-16 15:08:19kWh/h640000.000001275000.000001915000.0000037Y005053MH0000RUGS Etzel-ESE MET
590000000000000000000000059_001MET Speicher GmbHDismissedWithdrawal unavailability2022-09-27 06:00:002022-10-18 14:00:00Planned2022-05-16 15:30:18kWh/h209488.00000209489.00000418977.0000021YNL----TTF---1UGS Etzel-ESE MET
600000000000000000000000060_001MET Speicher GmbHDismissedInjection unavailability2022-09-27 06:00:002022-10-18 14:00:00Planned2022-05-16 15:32:43kWh/h127737.00000127737.00000255474.0000021YNL----TTF---1UGS Etzel-ESE MET
640000000000000000000000064_001MET Speicher GmbHDismissedInjection unavailability2022-05-19 06:00:002022-05-20 06:00:00Planned2022-05-18 13:23:03kWh/h491000.00000483000.00000974000.0000037Y005053MH0000RUGS Reckrod
Showing 121-140 of 145 items.
 IDMessage IDMarket Participant NameEvent StatusType of EventEvent StartEvent StopType of UnavailabilityPublication date/timeUnit of MeasurementUnavailable CapacityAvailable CapacityInstalled CapacityFuel TypeBidding ZoneAffected Asset Name
 
 
 
×
×
 
×
 
 
 
1420000000000000000000000142_001Stadtwerke Rostock AGInactiveProduction unavailability2023-04-11 00:00:002023-06-21 23:55:00Planned2023-06-01 12:28:30MW36.0000072.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
1440000000000000000000000144_001Stadtwerke Rostock AGInactiveProduction unavailability2023-06-23 00:00:002023-08-04 23:55:00Planned2023-06-05 07:29:53MW36.0000072.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
1450000000000000000000000145_001Stadtwerke Rostock AGInactiveProduction unavailability2023-08-11 00:00:002023-09-01 23:55:00Planned2023-06-05 07:41:02MW36.0000072.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
1460000000000000000000000146_001Stadtwerke Rostock AGInactiveProduction unavailability2023-09-15 00:00:002023-09-20 23:55:00Planned2023-06-05 07:43:10MW36.0000072.00000108.00000Fossil Gas11XSWROSTOCK---YRostock Marienehe Produktionsanlage
1530000000000000000000000139_010Ineos oxide utilities NVInactiveProduction unavailability2023-05-21 00:00:002023-06-12 17:00:00Planned2023-06-12 14:05:52MW87.0000052.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1560000000000000000000000154_003Ineos oxide utilities NVInactiveProduction unavailability2023-06-12 21:15:002023-06-16 14:25:00Unplanned2023-06-16 12:21:44MW10.00000129.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1600000000000000000000000160_001Ineos oxide utilities NVInactiveProduction unavailability2023-08-30 10:00:002023-08-31 15:00:00Planned2023-08-23 14:13:11MW98.0000041.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1720000000000000000000000161_004Ineos oxide utilities NVInactiveProduction unavailability2023-08-31 15:00:002023-10-06 00:00:00Planned2023-10-02 08:06:14MW92.5000046.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1750000000000000000000000162_006Ineos oxide utilities NVInactiveProduction unavailability2023-10-06 00:00:002023-10-09 10:00:00Planned2023-10-06 17:13:38MW98.0000041.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1780000000000000000000000163_006Ineos oxide utilities NVInactiveProduction unavailability2023-10-09 10:00:002023-11-15 00:00:00Planned2023-10-27 16:12:17MW92.5000046.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1880000000000000000000000180_006Ineos oxide utilities NVInactiveProduction unavailability2023-11-11 16:00:002023-11-22 18:00:00Unplanned2023-11-20 09:03:56MW117.0000022.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1890000000000000000000000186_002Ineos oxide utilities NVInactiveProduction unavailability2023-11-22 18:00:002023-11-23 14:00:00Planned2023-11-20 09:04:52MW101.0000038.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1900000000000000000000000187_002Ineos oxide utilities NVInactiveProduction unavailability2023-11-23 14:00:002023-11-29 00:00:00Planned2023-11-20 09:07:16MW93.0000046.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1910000000000000000000000191_001Ineos oxide utilities NVInactiveProduction unavailability2023-11-23 10:00:002023-11-25 00:00:00Planned2023-11-22 08:53:37MW139.000000.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1920000000000000000000000192_001Ineos oxide utilities NVInactiveProduction unavailability2023-12-04 16:00:002023-12-05 17:00:00Unplanned2023-12-04 15:37:15MW92.5000046.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1930000000000000000000000193_001Ineos oxide utilities NVInactiveProduction unavailability2023-12-07 15:00:002023-12-09 00:00:00Planned2023-12-07 10:02:15MW92.5000046.50000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1950000000000000000000000164_006Ineos oxide utilities NVInactiveProduction unavailability2023-11-15 00:00:002023-12-09 00:00:00Planned2023-12-09 09:47:31MW98.0000041.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1970000000000000000000000197_001Ineos oxide utilities NVInactiveProduction unavailability2023-12-14 08:00:002023-12-15 00:00:00Unplanned2023-12-14 07:53:19MW95.0000044.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
1980000000000000000000000196_002Ineos oxide utilities NVInactiveProduction unavailability2023-12-09 00:00:002023-12-22 15:00:00Planned2023-12-22 18:17:40MW46.0000093.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
2010000000000000000000000199_003Ineos oxide utilities NVInactiveProduction unavailability2023-12-23 10:00:002024-01-03 00:00:00Unplanned2023-12-26 11:25:37MW30.00000109.00000139.00000Fossil Gas10X1001A1001A094INESCO WKK
Showing 1-5 of 5 items.
 IDMessage IDMarket Participant NameEvent StatusEvent StartEvent StopPublication date/timeRemarks
 
 
×
×
×
120000000000000000000000012_001Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-13 15:04:43Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
140000000000000000000000012_002Swissgrid AGDismissed2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:40:34Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 1’452.80 MWh will be fed into the grid, which may have an impact on prices.
100000000000000000000000010_001Swissgrid AGInactive2020-12-21 00:00:002022-01-05 00:00:002021-12-23 09:12:31A temporary price Cap and Floor was introduced for Swiss offers in TERRE. From delivery period of 21.12.2020 00:00 onwards the offers prices in TERRE from Switzerland have been limited to +/- 999 EUR/MWh.

The temporary price Cap and Floor will be removed as of 05.01.2022. For delivery periods from 05.01.2022 00:00 onwards, the relevant price Cap and Floor will be +/- 9’999 EUR/MWh.
110000000000000000000000011_001Swissgrid AGInactive2022-12-01 00:00:002023-05-15 23:55:002022-10-25 13:42:46Information about the Swiss hydropower reserve administrated by Swissgrid according to the Swiss Ordinance on the establishment of a hydropower reserve is available on our website. Today Swissgrid procured a total energy volume of 400 GWh for the coming winter period (01 December 2022 until 15 May 2023). See https://www.swissgrid.ch/en/home/newsroom/newsfeed/20221025-01.html
130000000000000000000000013_001Swissgrid AGInactive2024-02-20 04:00:002024-02-21 19:00:002024-02-14 17:27:59UPDATE (reduced amount of energy)
Information: At the request of the Swiss supervisory authority ElCom, Swissgrid (Swiss TSO) will coordinate an energy reserve test with hydroelectric reserve, thermal reserve power plant and emergency power groups between 20/02/2024 04:00 and 21/02/2024 19:00. During this period, an excess of approx. 966.5 MWh will be fed into the grid, which may have an impact on prices.